5. Commissioning
5. Commissioning
28
29
Note!
When powering on the BMS, the system will start self-testing. If the
buzzer bips, it means DIP configuration fault or communication failure
occurs. If the buzzer bips, please check if the number of battery
modules is corresponding to the DIP configuration, and also check if
the RS485 communication calbes are correctly connected. After these
two situation checked OK, press the POWER button to power on, and
press the POWER button again 10s later. In addition: The buzzer will only
alarm on the corresponding fault during the power-on self-test. After
the self-test is completed, it won't bip again even if the same fault
occurs.
5.2
Commissioning
Verify the model number of each battery module to make sure that they are all
the same model.
If all the battery modules are installed, follow these steps to put it in operation.
1. Configure the DIP (
Ⅳ
) to corresponding number accroding to the number of
battery module(s) that has(have) been installed;
2. Remove the cover board of BMS;
3. Move the circuit breaker switch
(Ⅴ
) to the ON position;
4. Press the POWER button (
Ⅵ
) to turn on the T-BAT system;
5. Reinstall the cover board to BMS;
6. Turn on Inverter AC switch.
Note!
Frequently press the POWER button may cause the system error. Please
make sure at least 10 seconds is needed when you are going to press
the POWER button from the last pressing operation.
3
4
2