![Solas SCPV-12218-100 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/solas/scpv-12218-100/scpv-12218-100_installation-and-operation-manual_1314160011.webp)
10
FLUSH MOUNT (SIDE WALL) INSTALLATION
NOTE:
Locate the power vent termination following the clearance to combustible table, venting
configuration diagram (Fig. #2 & 3), and terminal location diagram (Fig. #1).
NOTE:
The following instructions are for use SCPV-160FM only.
1.
SCPV-160FM is designed to fit on center in between standard exterior 2x6 exterior framing. The
opening required in the framing and exterior sheathing is 14.50” (368mm) wide by 14.50”
(368mm) tall as shown in the image (right).
2.
The power vent termination is secured to the sidewall by the left, right, top and bottom nailing
flanges shown on page 6.
3.
The power vent termination requires a 1/8” clearance to the siding to permit servicing of the
blower motor. With this clearance requirement in mind, the opening required in the siding is
15.63” (397mm) wide by 13.13” (333.5mm) tall.
Required opening in framing &
sheathing
Power Vent installed in required
opening in framing & sheathing
Required opening in finished siding
Power Vent install with finished siding
Содержание SCPV-12218-100
Страница 2: ......
Страница 25: ...24 V1 5 5 20...