background image

15

Liability

Since observance of these installation instructions and the conditions and methods of installation, operation,
use and maintenance of the Suntub® mounting system is not checked or monitored by SolarWorld AG,
SolarWorld AG accepts no liability for damage arising through improper use or incorrect installation, operation,
use or maintenance. Moreover, SolarWorld® assumes no liability when SolarWorld®, its representatives or vicar-
ious agents are accused of gross negligence or intent. The previous restrictions do not apply to damage relating
to death, body or health, as well as in cases applicable to other laws, such as the liability for assumption of
guarantee, liability according to the German Product Liability Act (Produkthaftungsgesetz) or in the case of
infringements of important contractual obligations (cardinal obligations).

Regardless of the previously described limitations of liability, SolarWorld® assumes no liability for infringe-
ments of patent law or of third party rights arising from the use of the modules and the mounting system,
as is present under the regulations previously described.

The text and figures in this manual are in compliance with the state of technology at the time of printing
and are subject to change.

The warranty period is based solely on the usability of the Suntub® itself, and only on that component;
no liability is accepted for loss of yield or for assembly and disassembly costs in case of damage.

Maintenance/Cleaning/Liability

D

The installation company is responsible for ensuring professional grounding of the system and components.

No External lightning protection

A ground is recommended, and often required by local code, for PV-module frames and mounting racks.
Connect all electricity conducting parts with measures suited to this purpose and connect with the earth
(ground) circuit connector (PAS) with at least  mm² (copper).

External lightning protection

PV-Module frame and mounting frame must be included in the protection against the direct strike of
lightning. If necessary, consult a lighting protection expert.

C3

Grounding

Maintenance and cleaning

It is generally not necessary to clean the modules (rainfall will have a self-cleaning effect).

In case of heavy contamination (capacity reduction), we recommend cleaning the modules using plenty
of water (from a hose) without cleaning agents, along with a gentle cleaning brush or sponge. Dirt
must never be scraped or rubbed away when the modules are dry as this may cause micro-scratches,
which have a negative effect on the module performance

The generator field should be inspected at regular intervals for flawless condition (visual inspection).

The modules and the Suntub® must be inspected annually for correct position and secure mounting!

Содержание Suntub

Страница 1: ...SolarWorld And EveryDay is a SunDay www solarworld de July 2009 Flat roof assembly system Design and installation...

Страница 2: ...nts are used in order to ensure trouble free operation of your PV system The directions contained here are intended to assist you in properly installing your Suntub Assembly System Since individual ci...

Страница 3: ...ion Page 8 B 1 Dimensions Page 8 B 2 Required ballast load Page 10 B 3 Shading table Page 12 C 1 Setup Page 15 C 2 Module connection Page 16 C 3 Grounding Page 17 Maintenance Cleaning Liability A Safe...

Страница 4: ...he form of the fully insulated plug contacts the following points must be observed when handling solar modules to avoid the risk of fire sparking and fatal electric shock Do not install solar modules...

Страница 5: ...hat the runoff of rainwater is not impeded Consider any physical or structural issues Any assessment of structural or functional suitability of the roof to support the PV array should be conducted by...

Страница 6: ...omply with any local codes and standards applicable in the relevant country for installation and commis sioning The system connection to the public grid may only be performed by a qualified electricia...

Страница 7: ...ween 0 and All mandatory framework conditions and technical data are summarized in the following table Components 1 Module 2 Clamp 3 Aluminium profile to be inserted Suntub right part 5 Suntub left pa...

Страница 8: ...ght and the system location The required ballast loads have been calculated based on extensive wind tunnel tests and can be taken from the tables The following tables are applicable only with an avail...

Страница 9: ...edge area edge area of the system first and last row plus the last two units of a row The loads can be reduced for interior areas Centre ballast column 3 The edge area of the roof should be kept clea...

Страница 10: ...20 2 2 38 2523 3 3851 35 9 3302 3095 2920 2 2 38 4 228 3851 35 9 3302 3095 2920 2 5 12 228 3851 35 9 3302 3095 2920 6 5355 12 228 3851 35 9 3302 3095 B3 Shading table Sample calculation of required ba...

Страница 11: ...e Suntub with the flat surface facing south so that the modules are tilted to face the incoming sunlight The side distance between the modules when fully assembled should be at least 8 mm for the setu...

Страница 12: ...ed loads according to the system plan Gravel or concrete blocks may be used for example The ballast must be distributed evenly 3 Aluminium profile installation Next the two aluminium profiles are inse...

Страница 13: ...e Next the top clamping connections can be installed After the module has been aligned all bolts can be tightened tightening torque 20Nm The modules must be centered on the Suntub The distance between...

Страница 14: ...dry during installation 2 Install the group cable 3 Attach the cable to the supporting section using UV resistant cable binders 4 Install and wire the subsequent module rows Observe the polarity Obser...

Страница 15: ...sed solely on the usability of the Suntub itself and only on that component no liability is accepted for loss of yield or for assembly and disassembly costs in case of damage Maintenance Cleaning Liab...

Страница 16: ...Pte Ltd 72 Bendemeer Road 07 01 Luzerne Singapore 339941 Singapore SolarWorld Korea Ltd Gangnam Finance Center 16F Yeoksam dong Gangnam gu Seoul 135 925 South Korea 1 2 3 6 5 4 7 8 9 10 Production 1 D...

Отзывы: