Indication
ON/ OFF/
P
Switch
Position
LED Color
Comment
Red
Green
Blue
Inverter
configuration
or reboot
ON / P
ON
ON
ON
Inverter
firmware
upgrade
ON / P
Alternating Alternating
Alternating
The upgrade
process can take
up to 5 minutes
Error
Any
ON
ON/ OFF/
Blinking/
Flickering
ON/ OFF /
Blinking
Refer to
The following table describes production percentage of AC information by LED color
and ON/OFF/P switch position.
Indication
ON/
OFF/ P
Switch
Position
LED Color
Comment
Red
Green
Blue
Percentage of AC
Production:
0 %
ON (1)
OFF
OFF
OFF
This indicates
power
production as
percentage of
rated peak AC
output power
Percentage of AC
Production:
0 - 33 %
OFF
ON
OFF
Percentage of AC
Production:
33 - 66 %
OFF
OFF
ON
Percentage of AC
Production:
66 - 100 %
OFF
ON
ON
Opening Conduit Drill Guides
This step may be performed before or after mounting the inverter.
To open conduit drill guides:
1. Move the Safety Switch ON/OFF/P switch and the inverter ON/OFF/P switch to OFF.
2. Loosen the screws on the front cover of the Safety Switch, as shown below:
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00541-1.4
30
Opening Conduit Drill Guides