Physical Layout Editor

 1.  If you are a registered installer, access the monitoring platform site 

creation page at  

https://monitoring.solaredge.com/solaredge-

web/p/home#createSites

. If you have not yet signed up, go to 

https://monitoring.solaredge.com/solaredge-

web/p/createSelfNewInstaller

.

 2.  Fill out all required information in the screen, which includes information about 

your installation, as well as details about its logical and physical mapping.

Using a Paper Template

Fill out the Physical Layout Template (downloadable from the SolarEdge 

website 

http://www.solaredge.com/files/pdfs/physical-layout-

template.pdf

) using the detachable 2D barcode stickers on each power 

optimizer. Once the form is completed, use the Mapper to scan the 2D 

codes and  create the map in the  monitoring platform. Optionally, you can 

send the sticker sheet  to SolarEdge Support for physical layout creation.

Chapter 7: Setting Up Communication with the Monitoring Platform     

58

StorEdge Three Phase Inverter MAN-01-00648-1.3

Содержание StorEdge SE10K-RWS

Страница 1: ...Installation Guide StorEdge Three Phase Inverter For Europe and APAC Version 1 3...

Страница 2: ...ny time and without notice You may refer to the SolarEdge web site www solaredge com for the most updated version All company and brand products and service names are trademarks or registered trademar...

Страница 3: ...this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on you are encouraged to try to correct the interference by one...

Страница 4: ...roper Power Optimizer Connection 20 Chapter 3 Installing the Inverter 21 Inverter Package Contents 21 Identifying the Inverter 21 Inverter Interfaces 22 Mounting the Inverter 26 Selecting a Residual C...

Страница 5: ...5 Bus Connection 52 RS485 Bus Configuration 55 Verifying the Connection 55 Reporting and Monitoring Installation Data 56 Appendix A Errors and Troubleshooting 59 Identifying Errors 59 Troubleshooting...

Страница 6: ...nverter clearance added a link to Application Note Clearance Guidelines in Mounting the Inverter on page 26 Added Opening the Inverter Cover on page 31 Added Closing the Inverter Cover on page 39 Upda...

Страница 7: ...tly performed or adhered to could result in damage or destruction of the product Do not proceed beyond a caution sign until the indicated conditions are fully understood and met NOTE Denotes additiona...

Страница 8: ...h IEC60947 3 when installing the system with a worst case SafeDC voltage under fault conditions 120V The worst case voltage is defined as Voc max String Length 1 1V where Voc max Maximum Voc at lowest...

Страница 9: ...rce to SolarEdge inverter refer to https www solaredge com sites default files se inverter support of voltage sources pdf NOTE The following warning symbols appear on the inverter warning label Risk o...

Страница 10: ...NOTE For battery decommissioning and disposal follow the manufacturer requirements and instructions HANDLING AND SAFETY INSTRUCTIONS 9 StorEdge Three Phase Inverter MAN 01 00648 1 3...

Страница 11: ...Solution Components StorEdge Inverter is connected to a battery and supplies control and monitoring signals to the battery for operation in addition to its traditional functionality as a DC optimized...

Страница 12: ...on contact voltage detector Cordless drill with a torque clutch or screwdriver and bits suitable for the surface on which the inverter and optimizers will be installed Use of an impact driver is not a...

Страница 13: ...Storage Transport the inverter in its original packaging facing up and without exposing it to unnecessary shocks If the original package is no longer available use a similar box that can withstand the...

Страница 14: ...ptimizer must be operated according to the technical specifications provided with the power optimizer CAUTION Cutting the power optimizer input or output cable connector is prohibited and will void th...

Страница 15: ...ule connector manufacturer should explicitly verify compatibility with the SolarEdge optimizerconnectors and the Inverter DC input connectors A third party test report by one of the listed external la...

Страница 16: ...42 2019 as indicated in the serial number Example S N SJ5019A xxxxxxxx working week 50 2019 extension cables of up to 16 m can be installed per power optimizer 8 m for DC and 8 m for DC Between two p...

Страница 17: ...heir cables can be connected Make sure to use power optimizers that have the required output and input conductor length Completely shaded modules may cause their power optimizers to temporarily shut d...

Страница 18: ...ined space such as Building integrated photovoltaic BIPV modules ventilation measures may be required to ensure that the power optimizers are not exceeding the maximum temperatures stated in their spe...

Страница 19: ...power optimizer or through the mounting holes 3 Attach each power optimizer to the rack using M6 1 4 stainless steel bolts nuts and washers or other mounting hardware Apply torque of 9 10 N m 6 5 7 lb...

Страница 20: ...the Minus output connector of the string s first power optimizer to the Plus output connector of the string s second power optimizer 2 To minimize electromagnetic interference EMI make sure to minimi...

Страница 21: ...ystems For more information about the SolarEdge system s string voltage and current refer to the VOC and ISC in SolarEdge Systems Technical Note available on the SolarEdge website at https www solared...

Страница 22: ...s for fastening the inverter to the mounting bracket Installation guide Two 48 mm ferrite beads One 39 mm ferrite bead Lugs and M8 screws for connecting battery cables on the inverter side Heat shrink...

Страница 23: ...tions Each gland has three openings Battery DC inputs Two battery glands for connecting charging cables and ON OFF P switch ON 1 Turning this switch ON after power optimizer pairing starts the operati...

Страница 24: ...nds then released Starts pairing Pairing is indicated by all 3 LEDs blinking simultaneously LEDs LEDs three LEDs indicate by color and state on off blinking 1 flickering 2 alternating 3 different syst...

Страница 25: ...with the monitoring platform is established Pairing Blinking Blinking Blinking Wake up Grid Monitoring OFF Blinking Blinking System Producing OFF ON S_OK ON No S_OK OFF Night mode no production OFF Fl...

Страница 26: ...describes production percentage of AC information by LED color and ON OFF P switch position Indication ON OFF P Switch Position LED Color Comment Red Green Blue Percentage of AC Production 0 ON 1 OFF...

Страница 27: ...the inverter or power optimizer For SolarEdge inverters installed at a distance of 200 m 655 ft or closer to the shoreline special brackets purchased separately from SolarEdge and SS304 stainless scr...

Страница 28: ...ind the top mounting hole of the bracket Depending on the angle use the appropriate size and number of spacers so that the bracket is perpendicular to the ground Recommended a stainless steel 3 4 long...

Страница 29: ...ll the cover horizontally before lowering it Selecting a Residual Current Device RCD IMPORTANT SAFETY FEATURE All SolarEdge inverters incorporate a certified internal Residual Current Device RCD in or...

Страница 30: ...ommended to avoid nuisance tripping of the external RCD Select the appropriate RCD for correct operation of the installation An RCD with a rating of 30 mA may actually trip at a leakage as low as 15 m...

Страница 31: ...h is OFF For easy access to battery connectors it is recommended to connect the cables to the battery and to set all battery DIP switches to their correct positions before mounting the battery Measure...

Страница 32: ...g the Inverter Cover 1 Switch the inverter ON OFF P switch to OFF Wait 5 minutes for the capacitors to discharge 2 Disconnect AC to the inverter by turning off the circuit breaker on the distribution...

Страница 33: ...holding the inverter cover and remove the cover CAUTION When removing the cover make sure not to damage internal components SolarEdge will not be held responsible for any components damaged as a resu...

Страница 34: ...N m 0 88 1 1 lb ft 9 Check that the wires are fully inserted and cannot be pulled out easily 10 Tighten the AC gland with a torque of 2 8 3 3 N m 2 0 2 4 lb ft 11 Verify that there are no unconnected...

Страница 35: ...ach string to the DC and DC connectors See Figure 4 Figure 12 Inverter DC Connections Connecting the Energy Meter For Smart Energy Management applications such as maximizing self consumption the StorE...

Страница 36: ...d of the communication cable through the gland Figure 13 Meter Connection 3 Remove the 3 pin connector from the RS485 1 port on the communication board and loosen its screws StorEdge Three Phase Inver...

Страница 37: ...g the Battery WARNING The battery must be powered off before and during wiring For connecting the battery to the inverter use copper cables with the following parameters Maximum length 5m Cross sectio...

Страница 38: ...ables at correct polarity Connecting the power cables at reverse polarity may result in damage to the inverter or battery 8 Connect the DC cables to the battery terminals of the inverter Tighten the t...

Страница 39: ...connector 3 Set the DIP switches on the CAN bus board Two right DIP switches Switch to ON Left DIP switch PIN 2 PIN 6 Selects a grounding PIN for the CAN bus connector Set according to battery manufac...

Страница 40: ...ing hole on the side of the inverter as shown below Use an M6 screw Figure 18 Grounding the battery Closing the Inverter Cover 1 Mount the cover 2 Fasten all bolts slightly with a hand so that they ho...

Страница 41: ...3 Fasten all bolts to a torque of 4 N m in the order shown below Chapter 5 Connecting the Inverter 40 StorEdge Three Phase Inverter MAN 01 00648 1 3...

Страница 42: ...is created between the mobile device and the inverter and the system firmware is upgraded Before activation Download register first time only and log in to SetApp on your mobile device Verify that th...

Страница 43: ...n instructions scan the inverter QR code move the ON OFF P switch to P position for 2 seconds and release The mobile device creates a Wi Fi connection with the inverter and displays the main Commissio...

Страница 44: ...er enters Wake up mode until its working voltage is reached This mode is indicated by the flickering green inverter LED When working voltage is reached the inverter enters Production mode and produces...

Страница 45: ...t Status and verify that inverter is operating and producing power 3 Verify that the number of paired optimizers is the same as the number of physically installed power optimizers 4 Verify that additi...

Страница 46: ...ng Maintenance Diagnostics Self Test Battery Self Test Run Test 4 Wait for all tests to complete and check the results in the summary table If any of the tests have failed see the table below for poss...

Страница 47: ...ergy Manager Energy Control Maximum Self Consumption 3 Optionally set the battery OFF periods as follows a Select Set Operation and then select a month from the list that appears b Select a month A li...

Страница 48: ...ng types of communication can be used to transfer the monitored information from the inverter to the monitoring platform Only communication products offered by SolarEdge are supported Ethernet Etherne...

Страница 49: ...lt files se cellular plug in for inverters with setapp installation guide pdf ZigBee This option enables wireless connection to one or several Smart Energy products which automatically divert PV energ...

Страница 50: ...Gland 1 CAUTION The gland includes a rubber waterproof fitting which should be used to ensure proper sealing 3 Remove the plastic seal from one of the large openings 4 Remove the rubber fitting from t...

Страница 51: ...using a spool of cable connect as follows a Insert the cable through Commuication Gland 1 b Remove the cable s external insulation using a crimping tool or cable cutter and expose eight wires c Inser...

Страница 52: ...y to the monitoring platform 9 The inverter is configured by default to LAN If reconfiguration is required a Make sure the ON OFF P switch is OFF b Turn ON the AC to the inverter by turning ON the cir...

Страница 53: ...r details refer to https www solaredge com sites default files lightning_ surge_protection pdf If grounded metal conduits are used for routing the communication wires a lightning protection device is...

Страница 54: ...A and G connections as long as The same color wire is used for all A pins the same color for all B pins and the same color for all G pins The wire for G is not from the same twisted pair as A or B 5...

Страница 55: ...Terminate the first and last SolarEdge inverter in the chain The inverer can be terminated by switching on up the left DIP switch on the communication board Figure 24 RS485 termination switch NOTE On...

Страница 56: ...ess SetApp as described in Communication on page 43 4 From the Commissioning screen select Site Communication RS485 2 Protocol SolarEdge SolarEdge Leader 5 Return to the RS485 2 screen and select Foll...

Страница 57: ...ding up to date information viewed in a physical or logical view Logical Layout Shows a schematic tree layout of the components in the system such as inverters optimizers strings modules meters and se...

Страница 58: ...ut to the monitoring platform For more information refer to https www solaredge com products installer tools designer Mapper Application Use the Mapper smart phone application to scan the power optimi...

Страница 59: ...s details about its logical and physical mapping Using a Paper Template Fill out the Physical Layout Template downloadable from the SolarEdge website http www solaredge com files pdfs physical layout...

Страница 60: ...r types use the methods described below To identify the error type using the inverter LEDs 1 Move the ON OFF P switch to P position for 2 seconds and release it 2 Observe the LED lights and use the fo...

Страница 61: ...onnection No Internet connection Ping to google com failed Connect a laptop and check for internet connection If internet access is unavailable contact your IT admin or your internet provider For Wi F...

Страница 62: ...7E Low battery voltage Verify that the battery is connected to the inverter as required 1Dx88 Internal communication error Verify that the RS485 connector on the communication board is connected as re...

Страница 63: ...ely during sunlight Make sure to leave the inverter ON OFF P switch ON and that S_OK appears in the status screen String voltage is 0V Power optimizer s output is disconnected Connect all power optimi...

Страница 64: ...ted in the string and that no module outputs are connected without a power optimizer If the problem persists proceed to the next step Power optimizer s malfunction 1 Disconnect the wires connecting th...

Страница 65: ...ical Specifications The following figure provides inverter dimensions in mm in Figure 25 StorEdge Three Phase Inverter dimensions Appendix B Mechanical Specifications 64 StorEdge Three Phase Inverter...

Страница 66: ...the inverter P ON OFF switch to OFF 0 and wait 5 minutes for the capacitors to discharge 2 Disconnect the AC to the inverter by turning OFF the circuit breakers on the distribution panel WARNING SafeD...

Страница 67: ...Phase 8 11 5 13 16 A Residual Current Detector Residual Current Step Detector 300 30 mA Grids Supported Three Phase 3 N PE WYE with Neutral Utility Monitoring Islanding Protection Configurable Power F...

Страница 68: ...0178 IEC 62109 Grid Connection Standards 2 VDE 0126 1 1 VDE AR N 4105 AS 4777 G83 G59 Emissions IEC61000 6 2 IEC61000 6 3 IEC61000 3 11 IEC61000 3 12 RoHS Yes INSTALLATION SPECIFICATIONS AC Output Cab...

Страница 69: ...Protection Rating IP65 Outdoor and Indoor Mounting Bracket provided StorEdge Three Phase Inverter Technical Specifications 68 StorEdge Three Phase Inverter MAN 01 00648 1 3...

Страница 70: ...rror indicated on the product SetApp mobile application or on the monitoring platform or by the LEDs if there is such an indication System configuration information including the type and number of mo...