Chapter 4: Installing the Battery
Install the battery in accordance with the manufacturer instructions.
In addition, follow these guidelines:
Make sure the battery's circuit breaker switch is OFF.
For easy access to battery connectors, it is recommended to connect the cables to
the battery and to set all battery DIP switches to their correct positions
before
mounting the battery.
Measure the necessary length between the inverter and the battery for all cables.
Mark polarity on DC cables.
Chapter 4: Installing the Battery
30
StorEdge Three Phase Inverter MAN-01-00648-1.3
Содержание StorEdge SE10K-RWS
Страница 1: ...Installation Guide StorEdge Three Phase Inverter For Europe and APAC Version 1 3...
Страница 71: ......