Pre-commissioning when AC Power is Not Connected
(Option 1)
15
MAN-01-00822-1.1
17
1
3
4
Download SolarEdge SetApp
Start
Start and follow SetApp
Connect power bank
2
Turn ON
Power bank: 60W
output port , USB-C
Power Delivery (PD):
20V 3A (not provided)
Cover connector
when not used
5
7
6
Disconnect and remove power bank
Wait until inverter turns-off (all LEDs turn-off)
Turn switches to OFF
1 meter, USB-C / USB-C (not provided)
ON
Download
Содержание SEK Series
Страница 3: ...Notes...
Страница 12: ...2 WARNING DISCONNECT POWER BEFORE BEGINNING INSTALLATION 1 OFF OFF 3 Removing Covers 7 MAN 01 00822 1 1 9 4...
Страница 15: ...2 COMM 1 5 5 N m 3 A 4 LAN Communication 10 12 MAN 01 00822 1 1 Ethernet 1...
Страница 17: ...Wi Fi Communication Optional 12 5 5 N m 14 MAN 01 00822 1 1 2 3 4 5 1 Ordered separately...
Страница 19: ...A 3 4 1 2 3 4 6 5 3 5 N m Installing Covers 14 16 MAN 01 00822 1 1 2 1...
Страница 24: ...Notes MAN 01 00822 1 1 21...
Страница 25: ...Notes 22 MAN 01 00822 1 1...