Inverter Energy Status
Displays the total energy produced during the last day, month, year and since inverter installation.
Inverter Energy
Today
45 kWh
This Month
1.14 MWh
This Year
13.68 MWh
Total:
41.03 MWh
l
Today
: since midnight
l
This Month
: since 1st of the current month
l
This Year
: since January 1st
l
Total (Wh)
: The inverter total energy. If an external meter is installed, the value displayed in this line
depends on the meter type connected to the inverter and its location:
o
If a bidirectional meter is connected at the consumption point, this value is the consumed energy.
o
If the meter is installed at the production point, this value is the energy produced by the site.
o
If the meter is installed at the grid connection point, this value is the energy exported to the grid.
Meter Status
Meters
Export
– RS485-2 Modbus ID #2
Status: OK
Power: 7.60kW, Energy: 13.68MWh
Export
– GPIO S0 meter
1000 pulses per kWh
Power: 7.60kW, Energy: 13.68MWh
l
Type and function
: Displays the meter functionality (Production, Export, Import, Import)
l
Status
: Displays OK if the meter is communicating with the inverter
l
<Error message>
: If there is a meter error, it is displayed in this line.
l
Power
: Depending on the meter type connected to the inverter, this line displays the exported or
imported power