![SolarEdge L20-IB60, L20-IB00 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/solaredge/l20-ib60-l20-ib00/l20-ib60-l20-ib00_installation-manual_1313774041.webp)
33
L20, L30
Figure 25 L20-IB00 (External battery connections for long-run units)
Figure 26 L30-IB00 (External battery connections for long-run units)
NOTE!
The BAT+ of the UPS connect poles is connected to the anode of the positive
battery, the BAT-N is connected to the cathode of the positive battery and the
Содержание L20-IB60, L20-IB00
Страница 2: ......
Страница 17: ...9 L20 L30 Figure 5 Install covers...
Страница 27: ...19 L20 L30 5 5 Cabinet view Figure 15 Front view Side view of L20 and L30...
Страница 31: ...23 L20 L30 5 7 Electrical Diagrams Figure 19 Remote EPO NO and NC port...
Страница 32: ...24 L20 L30 Figure 20 External maintenance bypass auxiliary contacts...