Chapter 2: Installing the Power Optimizers
Safety
The following notes and warnings apply when installing the power optimizers. Some of
the following may not be applicable to smart modules:
WARNING!
When modifying an existing installation, turn OFF the inverter ON/OFF/P
switch, the DC Safety Unit (if applicable) and the AC circuit breaker on the main
AC distribution panel.
CAUTION!
Power optimizers are IP68/NEMA6P rated. Choose a mounting location where
optimizers will not be submerged in water.
CAUTION!
This unit must be operated according to the operating specifications provided
with the unit.
CAUTION!
Cutting the power optimizer input or output cable connector is prohibited and
will void the warranty.
CAUTION!
All PV modules must be connected to a power optimizer.
CAUTION!
If you intend to mount the optimizers directly to the module or module frame,
first consult the module manufacturer for guidance regarding the mounting
location and the impact, if any, on module warranty. Drilling holes in the
module frame should be done according to the module manufacturer
instructions.
Three Phase System MAN-01-00505-1.5
12
Chapter 2: Installing the Power Optimizers