Installing the Heat Exchanger Connections
Refer to Above For Individual Components.
1)
The threaded brass fittings are installed using at least 6 tight turns of Teflon Tape or Teflon pipe dope.
2)
Heat Exchanger IN (Hot Return): Starting at the bottom with the ¾” brass nipple, connect and tighten the
Hot Return Brass Fittings (with the temperature gauge and check valve) to the TOP Heat Exchanger fitting
as shown. Carefully follow the diagram at the top left of the previous page for installing the ball valve. Be
sure the check valves brass nipple has the stop facing the outside of the tank so the floating ball does not go
inside the nipple.
3)
Heat Exchanger OUT (Collector Feed): Starting at the bottom with the ¾” brass nipple, connect and
tighten the nipple, attach the ¾” to ½” brass adaptor, ½” street 90, charging valves, 6” nipple, expansion
tank and pressure gauge assembly, pump and temperature gauge as shown. Connect the bronze Pump
housing with the arrow up.
4)
If using non split insulation, put insulation on the feed and return lines prior to connecting lines to talk.
5)
Connect the Collector feed line to the tank’s pump feed line using the supplied ½ compression unions.
6)
Connect the Collector Hot Return Line to the short Hot Return Tank Fitting.
7)
Connect the tank hot and cold lines and Mixing Valves per the diagram below.
8)
Charge the system by following one of the 2 procedures in Section 11.0 below.
9)
Insulate all water lines including the last 5’ of cold water line as accessible with R-2.6 or greater insulation.
10)
The PV pump is simply connected to the switch, which is then connected to the PV panel wires: see 9.0.
Before insulating the lines, pressurize the solar loop with water and thoroughly test for leaks.
See following sheet for instructions on pressure testing and charging the Glycol Loop.
NOTE: The supplied system 5 mixing valve
(which automatically allows cold water to mix
into the hot water)
is required for SRCC OG300 and can be installed by your plumber.
There are many was to install the mixing valve as long as the ports ore correct. The
check valve is optional.
Mount the sheet titled
"Important Warnings and Instructions"
onto the front of the tank,
Cut out, peal the backing off and place the supplied labels with their corresponding
components.
TPRV
hot out
temp. gauge
(Optional)
tempering valve
(supplied w sys 5)
check valve (Optional)
mixed domestic hot
cold feed
with shut-off
Mixing Valve Installation
(Only the mixing valve is supplied with
the kit – the picture below is supplied
for illustration)
heat trap
(Optional)