SC01 Stacked Array Installation Kit
Loosely assemble your kit, per the following pictures, to locate the exact location of your
roof penetrations and then follow the flashing and roof boot installation instructions.
Feed Ell from Pump
SC01 - Stacked Collector
Array Installation Kit
Pre-soldered adaptor for
Pressure Relief Valve
and Coin Vent
Coin Vent
2” stick of ½” OD copper
Assembled SC01
Stacked Collector
Array
1 compression Ell for the feed. Bottom Roof “Boot”
Top roof “Boot”
150 Lb
pressure relief
valve
(PRV)
1 compression
TEE, to collector
1 compression
Ell for the
Collector Hot
Return
One union body
is supplied per
additional
system
collector.
IMPORTANT:
Be sure the
union body is
fully in place
before
tightening any
Lags, Bolts or
Tec screws.
Solar Hot
Return to
Tank
Содержание SkyLine 200152C80EX
Страница 31: ......