8 Maintenance and Inspections
The operations of maintenance and inspections are necessary in order to keep the technical
performance and safety features designed by the manufacturer during the life time of the
equipment.
Before the usage, make sure to have all the individual protections.
The person responsible of the maintenance and inspection must always be professionally
qualified and follow all the instructions in this manual.
Place the equipment on clean and solid surface and stop the excavator and remove the key
from the control panel.
Download the hydraulic oil pressure completely.
Wait for the oil to cool.
Every 40 hours in normal working conditions, proceed to the greasing as to point n.1 with
LOCTITE HEAVY DUTY ANTI SIEZE grease or similar. During particular crushing operations
service every 8 hours.
PARTS DRAWING PDO 100
Verify with the same frequency of the greasing inspections: the connection of the equipment to
the excavator and verify that the bush housings are not damaged.
Verify the clearance between the rods and the bushes, in case the clearance exceeds 0,6mm
replace the damaged components.
Verify the structure of the equipment and the cylinder rods.
Verify the bolt tightening.
Verify the conditions of the blades.
Verify that there are not any leakages in the hydraulic system (hoses, couplings, seals).
In order to avoid that the properties of the steel of the equipment do not place the equipment
near strong heat or welding procedures.
The manufacturer is not responsible for damages caused by modifications done to the
equipment if not approved by the it’s technical department.
Proceed with all service operations in a clean and illuminated workshop.
In case any hydraulic or mechanical parts are to be replaced, only original parts are to be used.
These are supplied by Socomec SpA specifying the product code, model, year of production
and serial number of the equipment.
MAINTENANCE AND INSPECTIONS
14
Page
of 29
8
Содержание PDO 100
Страница 4: ...Page 4 REQUEST OF SPARE PARTS 29 16 Richiesta parti di ricambio of 29 ...
Страница 20: ...4 11 1 Hydraulic circuit PDO 100 ACCELERATING VALVE DISTRIBUTOR TECHNICAL FEATURES 20 Page of 29 11 ...
Страница 21: ...14 15 16 17 5 3 8 9 4 1 7 12 10 2 11 13 6 COMPLETE PDO PARTS DRAWINGS 21 Page of 29 12 ...
Страница 25: ...41 46 46 41 43 44 45 47 42 41 50 49 48 COMPLETE CYLINDER 25 Page of 29 14 ...
Страница 27: ...55 54 53 54 58 59 52 57 56 51 60 COMPLETE DISTRIBUTOR 27 Page of 29 15 ...