background image

Three-phase Energy meter Measure via CT 

up to 12 000A - Ethernet MODBUS

COUNTIS 

E47

/

E48

www.socomec.com/en/countis-e4x

COUNTIS E47

COUNTIS E48 - MID

INSTRUCTION MANUAL

EN

Содержание COUNTIS E47

Страница 1: ...Three phase Energy meter Measure via CT up to 12 000A Ethernet MODBUS COUNTIS E47 E48 www socomec com en countis e4x COUNTIS E47 COUNTIS E48 MID INSTRUCTION MANUAL EN...

Страница 2: ...8 1 GENERAL INFORMATION 12 8 2 COMMUNICATION STRUCTURE 12 8 3 COMMUNICATION TABLES 12 9 CONFIGURATION 13 9 1 ONSCREEN CONFIGURATION 13 9 1 1 VIEW ALL OF THE MENU SETUP 2 14 9 1 2 DETAILED VIEW OF MENU...

Страница 3: ...EN COUNTIS E47 E48 547224A SOCOMEC 11 DIAGNOSTICS MESSAGES 27 11 1 MISSING PHASES 27 11 2 REVERSED PHASES 27 11 3 MALFUNCTION 27 12 ASSISTANCE 27 13 CHARACTERISTICS 28 14 GLOSSARY OF ABBREVIATIONS 31...

Страница 4: ...s and covers before turning on power to this equipment Always power the device with the correct rated voltage Install the unit following the recommended installation instructions and in a suitable ele...

Страница 5: ...of these instructions thoroughly before commissioning Check the following points as soon as you receive the package containing the unit The packaging is in good condition The unit has not been damaged...

Страница 6: ...l and partial energy Four tariff management T1 T2 T3 T4 Pulse output Electrical parameter measurements I U V f Bidirectional Power power factor Modbus TCP communication MID Description Reference COUNT...

Страница 7: ...cation of current menu 5 Device malfunction Replace the device 6 Active pulse output 7 Active communication 8 Setup menu 9 Main zone 10 Measurement Unit 11 Partials meters Flashing partial meter has s...

Страница 8: ...nductive and capacitive reactive energy Er kvarh Er per phase Total active reactive energy for each tariff T1 T2 T3 T4 Ea Er kWh kvarh Ea Er Eap per phase kWh kvarh kVAh Total reactive inductive and c...

Страница 9: ...install the device 5 1 Recommendations and safety Refer to the safety instructions section 2 Hazards and warnings page 4 Keep away from electromagnetic interference generator systems Avoid vibrations...

Страница 10: ...d for three phase networks with neutral 3 phases 4 wires 3 CT Ethernet RJ45 The Ethernet cable must pass twice through the ferrite core positioned at least 5 cm away from the device Pulse output 1 2 O...

Страница 11: ...ds page 10 Fitting terminal covers After connecting the device ensure that the terminal covers are fitted properly and secured by the plastic seals provided with the device Locking the program button...

Страница 12: ...lient server structure Communication is via TCP Transmission Control Protocol through the Ethernet communication port The default IP address is IP address 192 168 0 4 Subnet Mask 255 255 255 000 Gatew...

Страница 13: ...ng stages FUNCTION WHERE BUTTONS PRESS Switch menus Every page with the exception of SETUP 1 2 Realtime Switch pages within a menu Every page within a menu Realtime Go to menu SETUP 2 Menu page SETUP...

Страница 14: ...ent screens by pressing 3s IP address 1 IP address 2 IP address 3 IP address 4 Netmask 1 Netmask 2 Netmask 3 Netmask 4 Gateway 1 Gateway 2 Gateway 3 Gateway 4 Reset partial energy to zero Ea partial k...

Страница 15: ...00 001 254 255 IP address 4 000 001 004 254 255 Netmask 1 000 001 254 255 Netmask 2 000 001 254 255 Netmask 3 000 001 254 255 Netmask 4 000 001 254 255 Gateway 1 000 001 192 254 255 Gateway 2 000 001...

Страница 16: ...xample changing the communication address to IP 007 3s x1 Default Ethernet settings Eth SdEF x1 Confirm Y Save changes and exit N Exit without saving C Continue without saving x1 x1 x2 x1 x5 x1 x5 x1...

Страница 17: ...riff 1 Imported and exported capacitive reactive energy Tariff 2 Imported and exported capacitive reactive energy Tariff 3 Imported and exported capacitive reactive energy Tariff 4 Imported and export...

Страница 18: ...f 1 Exported active energy tariff 1 Imported inductive reactive energy tariff 1 Exported inductive reactive energy tariff 1 Imported capacitive reactive energy tariff 1 Exported capacitive reactive en...

Страница 19: ...f 2 Exported active energy tariff 2 Imported inductive reactive energy tariff 2 Exported inductive reactive energy tariff 2 Imported capacitive reactive energy tariff 2 Exported capacitive reactive en...

Страница 20: ...f 3 Exported active energy tariff 3 Imported inductive reactive energy tariff 3 Exported inductive reactive energy tariff 3 Imported capacitive reactive energy tariff 3 Exported capacitive reactive en...

Страница 21: ...f 4 Exported active energy tariff 4 Imported inductive reactive energy tariff 4 Exported inductive reactive energy tariff 4 Imported capacitive reactive energy tariff 4 Exported capacitive reactive en...

Страница 22: ...ted active energy L1 L2 L3 Total apparent energy Total imported inductive reactive energy Total exported inductive reactive energy Total imported capacitive reactive energy Total exported capacitive r...

Страница 23: ...Imported partial active energy for tariff T4 Partial imported active energy Exported partial active energy for tariff T1 Exported partial active energy for tariff T2 Exported partial active energy for...

Страница 24: ...224A SOCOMEC 10 6 1 Starting up the partial energy meter x1 Confirm Y OK N Cancel 10 6 2 Stopping the partial energy meter x1 Confirm Y OK N Cancel 10 6 3 Resetting the partial energy meter to zero 3s...

Страница 25: ...realtime readings rt Realtime active power L1 L2 L3 Realtime apparent power L1 L2 L3 Realtime reactive power L1 L2 L3 Realtime phase phase voltage Realtime phase neutral voltage Realtime three phase...

Страница 26: ...u info Metrological firmware version Non metrological firmware version Checksum of metrological firmware Checksum of non metrological firmware Installed communication port CT primary value CtP 1 12000...

Страница 27: ...d 11 2 Reversed phases If a 123 phase sequence is detected the symbol appears If a 132 phase sequence is detected the symbol appears 11 3 Malfunction If you see this message the meter has malfunctione...

Страница 28: ...T1 T2 T3 and T4 CURRENT MEASUREMENTS Type via current transformers CT burden for each phase 0 04 VA Startup current Ist 2mA Class 1 1mA Class C Minimum current Imin 0 10 A Transition current Itr 50mA...

Страница 29: ...99 99 MWh Reactive energy 1 display 8 digit 00000 000 kvarh 999999 99 Mvarh Apparent energy 1 display 8 digit 00000 000 kVAh 999999 99 MVAh Instantaneous active power 1 display 4 digit 0 000 kW 99 99...

Страница 30: ...ge temperature 25 C to 75 C Humidity 80 Installation Internal box cabinet Vibrations 0 075 mm HOUSING Dimensions W x H x D mm Modular width of 4 modules DIN 43880 72 x 90 x 64 Mounting On DIN rail EN...

Страница 31: ...for Tariff 4 tot Total menu PAr b Partial readings and energy balance menu rt Realtime values menu SEtuP 2 Setup 2 menu Addr Slave address bAud Communication speed in bauds bits per second Prty Commun...

Страница 32: ...547224A Non contractual document 2020 Socomec SAS All rights reserved CORPORATE HQ CONTACT SOCOMEC SAS 1 4 RUE DE WESTHOUSE 67235 BENFELD FRANCE www socomec com...

Отзывы: