background image

SOCOMEC - Ref. : 875 645 D

7

EN

G

LI

S

H

CONFIGURATION

KEY

INSTRUCTION

For 3 seconds to access 
access-code entry (CdE).

Note:
The device will automatically leave
the configuration menu if no buttons
are pressed for a period of 25
seconds.
Note:
Press the

button for a prolonged

period to scroll rapidly through the
configuration screens. Press for a
short period to scroll through each
screen one-by-one.

Note:
A long press on the button 

t

causes

rapid scrolling and a single short
press causes scrolling in steps of 5.

Note:
The values available depend on the
Ct ratio.

To enter code 21.

To validate the code and access to
the network programming (nET).

To select the network type, 1bL
(single phase), 2bL (two-phase),
3-4 nbL (unbalanced three-phase)
and 3-4 bL (balanced three-phase).

To validate the network programming
and go on to the current transformer
(CT) primary value.

To programme the primary value up
to 6000 A.

To validate the unit programming and
go on to the pulse output (PuLSES).

To go on to the weight of this output
(VAL).

To select the weight “0.1” for
0.1 kWh, “1” for 1 kWh, “10” for
10 kWh, “100” for 100 kWh.

To validate the programming of this
weight and go on to the pulse
duration (dur).

To select the duration from 60 to
900 ms.

To accept value and pass to partial
meter zero reset (rSET).

To select ‘rSEt nO’ (no reset to zero)
and ‘rSEt YES’ (reset to zero).

To confirm reset to zero and return to
network type programming.

+

To confirm and quit programming.

+

Содержание COUNTIS ATiv2

Страница 1: ...Industrial Switching Protection Systems COUNTIS ATv2 ATiv2 Operating instructions GB...

Страница 2: ...2 SOCOMEC Ref 875 645 D...

Страница 3: ...ATIONS ___________________ 4 GENERAL INFORMATION ______________________ 4 PRESENTATION _______________________________ 4 INSTALLATION ________________________________ 5 CONFIGURATION _________________...

Страница 4: ...on balanced 3 or 4 wire network This system comprises two products ATv2 a non insulated three phase active energy meter which does not allow earthing CT of secondary ATiv2 a three phase insulated sing...

Страница 5: ...To avoid damaging the device take care to observe the following before connecting the device indications on the casing network frequency 50 or 60 Hz maximum permanent voltage at voltage input terminal...

Страница 6: ...2 1 L1 L2 L3 P1 S1 P1 S1 2 4 6 8 1 3 5 7 9 11 ATiv2 1 L1 L2 L3 P1 S1 ATiv2 2 4 6 8 1 1 3 5 7 9 11 L1 L2 L3 P1 S1 P1 S1 2 4 6 8 1 3 5 7 9 11 ATiv2 1 L1 L2 L3 N P1 S1 P1 S1 P1 S1 2 4 6 8 1 3 5 7 9 11 AT...

Страница 7: ...network programming nET To select the network type 1bL single phase 2bL two phase 3 4 nbL unbalanced three phase and 3 4 bL balanced three phase To validate the network programming and go on to the c...

Страница 8: ...AC 20 Consumption 0 5 VA AUXILIARY POWER SUPPLY Type auto powered Consumption 1 VA ACCURACY Accuracy index IEC 61036 class 1 PULSE OUTPUT Reed relay 100 V DC 0 5 A 12 VA Pulse duration 60 to 900 ms Ma...

Страница 9: ...SOCOMEC Ref 875 645 D 9 ENGLISH...

Страница 10: ...CE Tel 33 0 3 88 57 41 41 Fax 33 0 3 88 57 78 78 SOCOMEC 95 rue Pierre Grange F 94132 Fontenay sous Bois Cedex FRANCE Tel 33 0 1 45 14 63 40 Fax 33 0 1 48 77 31 12 scp dcm socomec com SALES MANAGEMENT...

Отзывы: