![Soaring USA Stobel V2 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/soaring-usa/stobel-v2/stobel-v2_instructions-manual_1310758002.webp)
Instructions - Stobel
V2
Congratulations on the purchase of your Stobel, a high end DLG-competition model from LE-composites. We
hope you will be happy and successful. To ensure the optimum build we ask you if possible to follow in
accordance with instructions and work towards the completion carefully and accurately. Read the Instructions
carefully and build in the recommended order.
This model is designed for maximum flight performance and should be built as light as possible.
Always use only as much adhesive as is absolutely necessary!
2 hour build per LE-Composites Team instructions (not including cure time)-
Part included with delivery:
- Wing
- Fuz
- Rudder
- Elevator
- Hood
- 2x fiber rods
- Surface Bags
- Small parts consisting of:
•
2x M3 nylon screws
•
0.5 mm Steel wire
•
2 M4 aluminum screw
•
Male / Female 4-pole
•
1.5 mm CFRP rod
•
3x0, 08mm
•
GRP rudder horns
•
2
•
Kevlar cord
•
Cables
•
Throwing Blade
•
Servo board
•
2x control horns
•
2x former for ballast system
•
0.3 mm steel wire
•
large former
Completion of the WING
Throwing blade mounting:
The area has been reinforced for installation of the throwing blade provided. Per the diagram below, mark the
position to insert your throwing blade. Next, mark the outline of the throwing blade on the wing surface and
make the incision with a small milling cutter, make a neat cut to the contour of the blade. MEASURE TWICE,
cut once. It is recommended you Chamfer the throwing blade edges to customize the blade to your grip and to
take the edge off. Harden the support material by soaking with Superglue. After grinding the throwing blade,
yglue it in with 24 hour epoxy. A small glue bead around the blade ensures a greater stability and strength.
Содержание Stobel V2
Страница 1: ......