S&W Production & Post Production
SD1012 Installation Manual - Issue 6, Rev 1
Page 5
LOCATION AND ENVIRONMENT
- continued
Power Supply
All three major parts of the system - Switcher Mainframe, Router Mainframe, and Control Panel -
have the option to be fitted with dual power supplies. In each case the unit will work happily with a
single power-supply connected if required.
For safety a mains earth connection MUST be provided.
The unit has auto-ranging mains input, and can be connected to any standard AC supply between
115v and 230v 50/60Hz without adjustment.
Fusing
The control panel is protected by a 4 amp, and the mainframe by a 5 amp, anti-surge (slow-blow)
fuse located in the mains inlet / power switch assembly, see diagram below.
E
=
Protective Earth Conductor
N
=
Earthed Neutral Conductor
L
=
Phase Conductor
N
L
E
Fuse
Switch
Содержание SD1012
Страница 1: ...INSTALLATION MANUAL SD1012...
Страница 9: ...S W Production Post Production SD1012 Installation Manual Issue 6 Rev 1 Page 1 SECTION A INSTALLATION...
Страница 10: ...Page SD1012 Installation Manual Issue 6 Rev 1 S W Production Post Production 2 ELECTRICAL SUPPLY CONNECTION...
Страница 44: ...Page SD1012 Installation Manual Issue 6 Rev 1 S W Production Post Production 36 DELIBERATELY BLANK...
Страница 45: ...S W Production Post Production SD1012 Installation Manual Issue 6 Rev 1 Page 37 SECTION B SPECIFICATIONS...
Страница 53: ...S W Production Post Production END OF MANUAL...