Unpacking
Page
7
©
2016
SAM
Unpacking
Vega’s shipping carton includes:
• An Information Pack (Including this printed Quick Setup Guide and Vega 100 Series
manuals on the CD)
• The Vega 100 Series Router
• Up to two IEC mains cords
• Up to two USB ‘memory sticks’ (Including ‘reboot’ program for lost IP address’. One
per controller. Please refer to user manual)
Unpack the Vega router chassis. Place it on a suitable flat surface for testing.
Vega 200 & 400 Transit Brackets:
Loosen the two captive fasteners on the Vega 200/400 front door (A).
Open the Vega front door by pulling the door out and swinging it down.
Loosen the four transit bracket screws (B) and slide bracket to the right and remove it.
Re-tighten the four screws.
Unscrew the single transit bracket screw (C) and remove the bracket.
Put both transit brackets, the single screw and the packing in the Vega shipping carton, in
case subsequent transportation is required.
Close the Vega 200/400 front door and re-tighten the fasteners
.
Vega 700 Transit Brackets:
Unlock the Vega 700 quarter-turn door fastener (D). Open the door.
Unscrew the PSU Transit Bracket screw (F) and remove Bracket. Rotate the bracket 90
degrees and screw it into its storage position (E in Figure 4).
Unscrew the two Vega Card Transit Bracket screws (G) and remove the bracket. Secure
the bracket in its storage position on back of door (H).
Put Vega 700 packing in its shipping carton, in case subsequent transportation is required.
Close the Vega 700 front door and lock the quarter-turn door fastener.