background image

S150X 21HP, 23HP, 25HP & 27HP - 48” & 52” Mower Deck

10/2007

9

TP 300-7343-A-M1-SP

Check Deck Rod Timing

1. Park machine on a flat, level surface.  Disengage the

PTO, stop the engine and engage the parking brake.
Rear tires must be inflated to 15 psi (1,03 bar); front
tires to 25 psi (1,72 bar).

2. To check the lift rod timing, measure and record the

distance between the lift pivots and the rod pivots.
Repeat for the other side of the machine. See Figure
15.

3. If the measurements for the rods are equal, no

further adjustment is required.  If the measurements
are NOT equal (greater than 1/8” (3,17mm)
difference), adjustment is required, continue with
Step 5.

4. Lock the deck lift pedal in the 5” (12,7cm) position.

Remove the cutting height adjustment pin and lower
the mower deck.

5. To ensure that the deck is in the lowest position,

push the pedal by hand towards the rear of the
machine and install the height adjustment pin in the
3” (7.6cm) position to hold in place.

6. Block up the mower deck until all hanger chains are

slack.  Refer to Figure 16.

7. See Figure 15.  To adjust the lift rod, loosen the jam

nut on the clevis then remove the 1/2” clevis pin
fastening the clevis the the lift pivot arm.  Turn the
clevis clockwise to shorten the distance between the
rod pivots or counterclockwise to lengthen the
distance between the rod pivots.  Reinstall the clevis
on the lift pivot arm and secure with the 1/2” clevis
pin previously removed.  Tighten the jam nut against
the clevis.  

8. Remove the blocks from under the mower deck.
9. Remove the the cutting height adjustment pin from in

front of the deck lift pedal arm.  Lift the mower deck
and reinstall the adjustment pin in the desired
mowing height.

Figure 15.  Check Lift Rod Timing

Figure 16.  Adjust Lift Rod Timing

Содержание 5900665

Страница 1: ...help you identify and check that the items have been performed Additional information concerning functional tests general adjustment procedures and the location of normal lubrication points are inclu...

Страница 2: ...ctor Assembly Assemble the Motion Control Handles Assemble the Seat 5 Roll Bar Installation Install the Roll Bar 6 Check Fluid Levels Check Engine Oil level Check Hydraulic Oil level Check Tire Pressu...

Страница 3: ...to 80 120 in lbs 9 13 5 N m IMPORTANT NOTE When cutting crate from bottom skid use caution around tractor tires and mower rollers Figure 2 Disengaging the Parking Brake lever shown in disengaged posit...

Страница 4: ...a LEFT HAND and a RIGHT HAND control handle When assembled to the base the handle base should be pointing towards the rear as shown in Figure 4 Figure 4 Install the Control Handle s A Control Handle...

Страница 5: ...Pin A B C Assemble the Top Loop 1 Install the plastic cap B Figure 7 into the end of the top loop tube A Repeat for other end of tube 2 Install the rubber stop C against the inside of the pivot mount...

Страница 6: ...on the bolts Repeat this process for the other side 6 Tighten the hardware installed in steps 3 4 for securing the roll bar upright tubes to the roll bar pocket Tighten the hardware until there is no...

Страница 7: ...own the filler neck of the hydraulic oil reservoir A and observe the oil level When cold the oil level should be approximately 4 10 cm below top of the filler neck 4 If necessary add SAE 20W 50 motor...

Страница 8: ...installed with the tabs pointing up toward the deck as shown in Figure 14 Torque the bolts to 70 ft lbs 94 N m Figure 14 Check the Blade Torque A Blade Bolt B Flat Washer WARNING Mower blades are shar...

Страница 9: ...that the deck is in the lowest position push the pedal by hand towards the rear of the machine and install the height adjustment pin in the 3 7 6cm position to hold in place 6 Block up the mower deck...

Страница 10: ...st the front eyebolts until the chains are tight and the deck is still resting on the 2 x 4 s Tighten the jam nuts See Figure 18 7 Loosen the nuts and allow the rear of the deck to rest on the 2 x 4 s...

Страница 11: ...clockwise which will relieve the tension on the belt exerted from the idler arm 5 Re seat belt and carefully release the tension on the breaker bar 6 Reinstall the mower deck guards Figure 20 Mower PT...

Страница 12: ...l control handle pivots seat plate pivots deck lift pivots discharge chute hinge Generally all the moving metal parts should be oiled where contact is made with other parts Keep oil and grease off bel...

Страница 13: ...e operator s seat engage the parking brake and make sure the PTO switch is disengaged and the motion control handles are locked in the NEUTRAL position 2 Set the engine throttle control to FULL thrott...

Страница 14: ...ir operation regularly Operational SAFETY Checks Test 1 Engine should NOT crank if PTO switch is engaged OR Parking brake is not engaged OR Motion control handles are not in the NEUTRAL position Test...

Страница 15: ...back angle Forward and Backward Adjustment Move the forward backward seat adjustment lever A Figure 28 away from the seat position the seat as desired and release the lever to lock the seat into posit...

Страница 16: ...MENT Loosen the mount bolts A Figure 29 and pivot the lever s B to align with each other TO ADJUST THE HANDLE PLACEMENT Loosen the jam nuts and adjust the placement bolt C in or out to properly adjust...

Страница 17: ...al return bushing E is seated correctly in the spring stop plate F 4 Position the rear set collar so that it sets tightly against neutral return bushing and tighten 5 Pull the ground speed control lev...

Страница 18: ...ake spring A Figure 32 3 With the parking brake engaged measure the compressed spring length The spring should be 2 2 1 8 5 0 5 4 cm when compressed 4 If the spring is not within this range release th...

Страница 19: ...ts Group Copyright 2007 Briggs Stratton Corporation Milwaukee WI USA All rights reserved The Snapper Pro logo is a trademark of Briggs Stratton Corporation Milwaukee WI USA Contact Information Briggs...

Отзывы: