S150X 21HP, 23HP, 25HP & 27HP - 48” & 52” Mower Deck
TP 300-7343-A-M1-SP
10/2007
6
F
A
E
D
B
Figure 10. Install Top Loop (Right Side Shown)
A. Top Loop
B. Upright Tube
C. 1/2” x 3” Bolt GD.5
D. Retainer Pin Assembly
E. 1/2” Side Lock Nut
F. Rubber Stop
A
C
E
E
D
C
B
B
5. Install the top loop (A, Figure 10) onto the upright
tubes (B). From the outside, install the 1/2-3” bolt (C)
through the top loop and upright tube, then through
the retainer pin assembly (D), as shown in Figure 5E.
Loosely install the 1/2” side lock nut on the bolts.
Repeat this process for the other side.
6. Tighten the hardware installed in steps 3 & 4 for
securing the roll bar upright tubes to the roll bar
pocket. Tighten the hardware until there is no
movement in the upright tubes.
7. Tighten the 1/2”-3 bolts and hex side lock nuts (C &
E) securing the top loop (A) to the upright tubes (B).
Do not over-tighten. The top loop should pivot snugly
with the retainer pins removed.
8. Raise the top loop (A) until the rubber stops (F)
contact the upright tubes.
9. Push or pull the top of the roll bar forward against the
rubber stops and install the retainer pins and hair pin
clips to secure the roll bar in the raised position.
D
Figure 9. Roll Bar Orientation