background image

Pg. 2

www.snapav.com  Support: 866.838.5052

SM-RBX-PRO-8-BLK Installation Manual

Old Work Installation Instructions

1.   Mark the desired height of the top of the SM-RBX-PRO-8-BLK on the wall 

between two stud centers.  Use a stud finder to locate the stud locations.

2.   Use the cutout template from the box, or located on the support tab of the 

product page on snapav.com to mark the wall, using a level to line it up 
correctly. 

3.  Carefully cut the opening using a drywall saw. 

4.   After the hole is cut, test fit the box, and clean up the 

opening as needed.

5.   Remove the center support plate from the Strong VersaBox™.  The platform 

standoffs must be removed prior to securing the VersaBox Pro with lag 
bolts. See: Changing the Center Support Plate position.

6.   Insert the box into the opening. Using a #1 Phillips screwdriver, secure 

the box to the drywall using the dog legs on each side of the enclosure as 
illustrated.

7.  Install the trim/bezel with 8 screws on the inside edge for a finished look.

 Note: 

If any of the 4 dog legs will not extend correctly due to stud clearance 

beside the box, a screw may be inserted through the side of the box into 
the stud if one is close enough.  Refer to the New Work Installation section 
later in the manual for reference of where to insert the screw/s.

If mounting vertically, the trim/bezel must be installed first and all four dog 

ears must be engaged.

Assembly Diagram

Note:

 To remove the cover with 

ease, swing door open pulling 

from the finger openings on the 
side of the cover first.

Single Gang Enclosure 

on 2 sides

Removable Panel for 

Compact Wattbox

Tighten

Screws with

#1 Phillips

Screwdriver

Cutout Dimensions

14.25" (W) x 8.5" (H)

Horizontal

Dog Ears

New Work Installation Instructions

The SM-RBX-PRO-8-BLK dust cover is designed to preserve the Strong In-Wall VersaBox in new work applications before drywall 
is hung on the studs.

Note:

 

Determine what thickness the drywall will be, before installing. If the studs are wider than 16” use dog ears once the drywall is 

installed. You cannot mount vertically in new installs. To mount vertically,  the dog ears must clasp the drywall.

Strong VersaBox™ Pro Installation (before drywall is installed) 

1.   Remove the center support plate from the VersaBox Pro. The  platform 

standoffs must be removed prior to securing the VersaBox Pro with lag bolts. 
See: Changing the Center Support Plate position.

2.   Open any knockouts in the VersaBox Pro that will be used for wiring or 

electrical.

3.   Pull the wires out of the wall opening and pull them into the desired openings 

of the VersaBox.

4.   Attach the VersaBox Pro to the studs with the 4 included lag bolts and protect 

the inside of the VersaBox Pro from the drywall install by inserting the dust 
cover.

5.    Once drywall is installed, remove the dust cover, attach the trim/bezel, and 

install equipment.

  

Go to the SM-RBX-PRO-8-BLK product page at www.SnapAV.com for tips 
and instructions to install equipment into the VersaBox Pro. 

Note:

 

You cannot mount vertically in new installs. 

To mount vertically,  the dog ears must clasp the 

drywall.

Note:

 Screwholes are only on the 

short sides.

Отзывы: