Snap
‐
on
EEW
B
33
0
A
Handspin
Wheel
Balancer
6.0
Maintenance
This
unit
is
designed
to
operate
for
a
long
time.
If
the
operator
shuts
down
correctly
(5.4.4)
at
the
end
of
each
shift,
no
further
maintenance
is
required.
This
unit
must
not
be
opened
by
the
operator,
except
in
accordance
with
explicit
instructions.
6.1
Storage
When
the
unit
will
be
stored
for
a
several
weeks
or
longer,
prepare
the
unit
correctly:
Shut
down
the
unit
properly
(5.4.4).
Remove
the
stub
shaft
from
the
flange.
Apply
a
light,
non
‐
corrosive
oil
onto
all
threads
and
cones.
Wrap
oiled
items
in
paper
to
keep
the
parts
dust
free.
When
the
unit
will
be
put
into
use
again,
clean
all
oiled
parts.
6.2
Changing
the
main
fuse
Refer
to
Figure
6
‐
1.
Switch
off
the
unit.
Unplug
the
power
cord
from
the
power
outlet.
Remove
the
power
cord
from
the
mains
cable
inlet.
Pull
out
the
fuse
holder
(1).
Replace
the
fuse
by
an
identical
rated
one.
Bring
unit
back
to
its
original
state.