![SMS TORK REA 60 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/sms/tork-rea-60/tork-rea-60_installation-and-operating-manual_1306751017.webp)
OPERATION INSTRUCTION
Electrical Connections and Preliminary Test
Loosen the screws on the actuator cover and lift it off
Make sure that the power supply voltage is in accordance with the data on the actuator name plate
Connect wires according to the enclosed wiring diagram
Move the valve manually to a half-open position, operate and electrical opening and check that the motor
rotates in the right direction
Standard units are counter-clockwise to open set
Test the actuator and check the limit switches work correctly
Check all the cable glands are correctly tightened, applicable cable glands should be selected to be meet the
applications condition. Over the grade IP67 of cable gland recommended in potentially explosive
atmospheres.
Mount cover and tighten cover bolts
Wiring Diagram for 230V AC On/Off Type
Содержание TORK REA 60
Страница 1: ...SMS Sanayi Malzemeleri ve Sat s A S REA 60 Electric Actuator Manual...
Страница 11: ...ACTUATOR MOUNTING DETAILS Danger HAZARDOUS VOLTAGE Make sure all power is disconnected prior to mounting...
Страница 16: ...Lay Out of PCU Card...
Страница 18: ...Wiring Diagram for 230V AC PCU Type...
Страница 19: ...Wiring Diagram for 24VAC On Off Type...
Страница 20: ...Wiring Diagram for 24V DC On Off Type...
Страница 24: ...DIMENSION FOR ACTUATOR On Off Type...
Страница 25: ...PCU Type...