background image

 

 

7

 

Taifun

 

GT one 

®

 

8. CLEANING 

Do not use cleaning agents as they could harm the O-Rings. 
Before assembling, check the completeness and positioning of the O-Rings to prevent leakage of liquid. 

• 

Disassemble the device into its components. 

• 

Clean the components (not the cotton) with warm water or in an ultrasonic bath. 

• 

Completely dry the components before reassembling the device. 

 

9. MAINTANANCE 

• 

Wait until the device has completely cooled down before disassembling, to prevent burns. 

• 

Make sure that there is no power supply by unscrewing the device from the mod or by switching off the mod. 

 

ASSEMBLING DEVICE 

• 

The device is usually delivered fully assembled, the following instructions are for the assembly after cleaning. 

• 

Moistening the sealing rings with liquid makes the assembly easier.  

• 

Please use only suitable tools for assembly.  

 

  

 

 

 

 

The positive pole [N] is plugged into the positive pole isolator [B] 

 

The isolator [E] is inserted into the base [A] from below. 

 

 

 

 

 

Now the positive pole [N] with the isolator [B]  

is pushed into the base [A]. 

 

Then push the positive pole screw [C] from below through  

the base [A] and fix the positive pole [N]. 

 

 

 

 

 

The grub screw [F] is screwed into the base [A] from the side. 

(optional) 

 

A suitable air pin [Q] is inserted into the positive pole [N].  

(optional) 

Содержание Taifun GT one

Страница 1: ...e an asthma attack shortness of breath and coughing fits in the case of a previously damaged lung If complaints occur please seek medical attention immediately Do not use our product if you have a kno...

Страница 2: ...ble of performance use of mods without protection is not recommended 3 MANUFACTURER RECOMMENDATIONS Adjust the power of your mod to an appropriate level depending on the used coil 4 STORAGE INSTRUCTIO...

Страница 3: ...ll 1x Tank Section Tankshield 1x Tank Section PSU Tank 1x O Ring NBR 50 17x1 5 mm 1x O Ring NBR 50 15x1 mm 1x Positive Pole 1x Screw M2x4 mm 1 x O Ring NBR 70 8x1 mm 1x Air Pin 1x O Ring NBR 70 2x1 mm...

Страница 4: ...e screws Then bend the wire ends and retighten the screws D and O again This fixes the coil in place With a winding aid the coil can still be aligned somewhat Cut off the exceeding ends of the wire Th...

Страница 5: ...ank at a slight angle at the beginning Carefully fill the liquid into the tank along the edge During filling slightly raise the tank again so that you can see the filling level Stop filling as soon as...

Страница 6: ...the 0 9 mm Allen key if necessary Depending on your own draw technique and the amount of nicotine in the liquid the insertion of the grub screw can increase the noticeable throat hit However it should...

Страница 7: ...g the device from the mod or by switching off the mod ASSEMBLING DEVICE The device is usually delivered fully assembled the following instructions are for the assembly after cleaning Moistening the se...

Страница 8: ...horized dealers Before replacing the PSU Tank the atomizer must be completely emptied REPLACING SEALING RINGS Sealing rings are used to seal the device If you notice liquid or moisture leaking out of...

Отзывы: