19A SERIES BOILER

INSTALLATION INSTRUCTIONS

PAGE 8

15. CONTROL LOCATIONS

NOTE

Jacket front panel should be in place before controls on
front of front section are installed.

Refer to FIGURE 11 showing locations recommended for
steam and water boiler limit and operating controls. Note the
requirement for an operating temperature control whenever
a tankless heater is called for. This is in addition to pressure
limit controls and other operating controls on steam boilers.

NOTE

On steam boilers the 1" close nipple and 1" x 1/4"
reducing coupling for operating control should be installed
prior to jacket top panels.

16. JACKET

Jacket assembly details are contained in a separate instruction
booklet.

17. SAFETY AND RELIEF VALVES

Safety and relief valves sized on the output rating of each
boiler size are furnished along with the necessary pipe and
fittings for installation in the back section. The valve discharge
connections should be piped to a location where people will
not be exposed to hot vapor or liquid. Any discharge piping
should be supported so as to prevent exerting any strain on
the valve body by the weight of the piping. See FIGURE 10.

FIGURE 10

Some state and local codes require steam safety valves be
piped to the atmosphere outside the building.

13. CLEANOUT COVERS

Be sure the rope seals are in place around the groove in the
cleanout cover plate. Install the plates on the boiler sections
carefully to insure proper sealing all around, using the
5/16" x 2" special anchor bolt and 5/16" hex head nuts. After
periodic flue cleaning, replace nuts at 10 lbs. torque. Use
Hi-Temp silicone caulk to seal covers air-tight.

14. REAR OBSERVATION PORTS 7-12 SECTIONS

INSTRUCTIONS FOR ASSEMBLY:
1. Locate steel “flapper door” (Item 6) as shown in FIGURE

9 below. Drive Item 7, “expansion pin”, into hole in Item 1
to secure 6 in position.

2. Lift Item 6 up and install Item 2, “hex bolt”.

3. Slide Item 3, “compression spring” over the hex bolt and

screw Item 4 “hex nut” to hex bolt.

4. Screw Item 5, “ball knob” into position and lock location

using Item 4 as a “jam” nut.

5. Adhere 24-1/2" insulating tape as shown to Item 1.6.

Mount assembly to back section of boiler.

7. 3-6 section boilers use a solid cover which is installed the

same way.

FIGURE 9

IMPORTANT

Item 6 must always be part of the assembly. Check
condition twice a year and replace as needed.

1

2

3

4

5

7

6

INSULATING TAPE

FOR DISCHARGE PIPING THROUGH ROOF CONSULT THE SMITH COMPANY

DISCHARGE PIPE SIZE
TO EQUAL VALVE OUTLET. 
DO NOT RESTRICT FLOW.

RELIEF  OR SAFETY VALVE
DO NOT REMOVE RATING
OR WARNING TAGS.

SUPPORT DISCHARGE
PIPING SO AS TO AVOID
STRAIN ON VALVE BODY

DISCHARGE SO AS TO
AVOID EXPOSURE OF
PERSONS TO HOT
LIQUID OR VAPOR.
LEAVE OPEN END
VISIBLE FOR PERIODIC
INSPECTION FOR SLOW
LEAKAGE OR DRIPS.

Содержание 19A Series

Страница 1: ...motive anti freeze in boiler waterways If necessary to use anti freeze be sure to employ a preparation designed for hydronic heating systems such as ethylene or propylene glycol Water treatment is not recommended This boiler uses gaskets to seal the ports of adjoining sections These gaskets are made of a fluorocarbon elastomer designation FKM marketed under the brand name Viton Consult a water tre...

Страница 2: ...ng Includes Mounting Plate w Observation Glass and Cover PAGE 2 19A SERIES BOILER INSTALLATION INSTRUCTIONS 13 78105 Burner Mounting Plate Rope 1 4 x 4 75 14 60434 Burner Mounting Plate Insulating Block 14 60430 Burner Mounting Plate Insulating Block Beckett Burner 3 6 Section 15 Upper Port Hydronic Seal 16 Lower Port Hydronic Seal 17 60025 Insulating Ceramic Rope 18 Tie Rod Hardware 19 Front Obse...

Страница 3: ...arge cast iron cover plates A slide damper is provided in the flue gas outlet for back pressure adjustment The boilers are supplied completely knocked down for field assembly as factory assembled blocks of sections or completely assembled boiler burner units All items should be inspected for damage upon receipt and any damage reported to the wholesaler and trucker All components should be stored i...

Страница 4: ...must be provided to allow complete combustion of fuel and ventilation of the room to avoid excessively high ambient temperature Air inlet by natural ventilation directly from the outside shall have total free area of not less than one sq in per 14 000 BTU per hour of input of all fuel burning appliances in the boiler room Where combustion air must be obtained through ducts see ANSI NFPA 31 or ANSI...

Страница 5: ...R LEFT 5 FT LBS STEP 4 LOWER RIGHT 5 FT LBS STEP 5 UPPER RIGHT 25 FT LBS STEP 6 LOWER LEFT 25 FT LBS STEP 7 UPPER RIGHT 50 FT LBS STEP 8 LOWER LEFT 50 FT LBS STEP 9 UPPER LEFT 10 FT LBS STEP 10 LOWER RIGHT 10 FT LBS Prepare additional intermediate sections and install in the same manner described above Be sure each section is properly sealed against water leakage and flue gas exfiltration Be certa...

Страница 6: ...he 5 16 x 1 1 2 studs and hex nuts furnished in screw seats in the back section Apply self adhesive insulating tape Items 21 and 22 in Parts detail drawing on Page 2 to smoke hood flange and damper angle Item 23 Fasten the slide damper in the open position for starting the burner adjustment process See FIGURE 6 for recommended L coil piping and FIGURE 7 for SM9 18 single and or dual piping arrange...

Страница 7: ...NION GATE VALVE TEMPERING VALVE FLOW LIMITING VALVE TEMPERATURE GAUGE OPERATING CONTROL TANKLESS HEATER TEMPERED WATER SUPPLY COLD WATER INLET The sealing rope should be placed in the groove on the boiler side of the plate using adhesive to hold it in place The insulation block has a burner opening and a cutout for the observation opening Locate the block with the high temperature facing on the fi...

Страница 8: ...OUT COVERS Be sure the rope seals are in place around the groove in the cleanout cover plate Install the plates on the boiler sections carefully to insure proper sealing all around using the 5 16 x 2 special anchor bolt and 5 16 hex head nuts After periodic flue cleaning replace nuts at 10 lbs torque Use Hi Temp silicone caulk to seal covers air tight 14 REAR OBSERVATION PORTS 7 12 SECTIONS INSTRU...

Страница 9: ...WAYS A STEAM BOILERS NOTE The boiler should be cleaned before connecting system piping and installing steam trim 1 Plug unused openings all around the boiler leaving a valved overflow pipe connected to the safety valve tapping Also provide a valved blow down connection to one of the bottom tappings 2 The fuel burning equipment should be installed and made ready to operate in accordance with the bu...

Страница 10: ...T CONN FRONT VIEW SIDE VIEW TOP VIEW 12 ADAPTER COLLAR 11 12 SECTION ONLY SERIES 19A BOILER STEAM TAPPING AND CONTROL LOCATIONS 3 SUPPLY TAPS 3 4 41 1 4 A 1 TAP AIR REMOVAL CONN OPT LWCO B 1 1 4 TAP SAFETY VALVE C 1 TAP OPTIONAL LWCO D 3 4 TAP OPER TEMP CONN A B VENT CONNECTION 3 4 TAP STD MAN RESET HIGH LIMIT 3 A 4 SUPPLY CLEANOUTS 3 RETURN TAP OPTIONAL INSPECTION TAPPINGS 3 4 TAP OPT OPT INSP TA...

Страница 11: ... monoxide Hot gases from appliance venting system pipes or chimney escaping into the living space Flames coming out around the appliance Yellow colored flames in the appliance Stale or smelly air The presence of soot or carbon in or around the appliance Very high unexplained humidity inside the building If any of the symptoms of CO poisoning occur or if any of the signs of carbon monoxide are pres...

Страница 12: ...WESTCAST INC 260 NORTH ELM STREET WESTFIELD MA 01085 TEL 413 562 9631 FAX 413 562 3799 ...

Отзывы: