Installation
91
EN
The nozzles not provided are available at Authorised Service Centres.
7 LPG G30/31 - 30/37 mbar
AUX
SR
UR-3c
Rated heating capacity (kW)
1.05
1.8
3.5
Nozzle diameter (1/100 mm)
50
65
94
Pre-chamber (printed on nozzle)
-
-
-
Reduced flow rate (W)
400
500
1600
Rated flow rate G30 (g/h)
76
131
255
Rated flow rate G31 (g/h)
75
129
250
8 LPG G30/31 - 37 mbar
AUX
SR
UR-3c
Rated heating capacity (kW)
1.1
1.8
3.5
Nozzle diameter (1/100 mm)
50
65
91
Pre-chamber (printed on nozzle)
-
-
-
Reduced flow rate (W)
450
550
1600
Rated flow rate G30 (g/h)
80
131
255
Rated flow rate G31 (g/h)
79
129
250
9 LPG G30/31 - 50 mbar
AUX
SR
UR-3c
Rated heating capacity (kW)
1.05
1.8
3.5
Nozzle diameter (1/100 mm)
43
58
75
Pre-chamber (printed on nozzle)
(H2)
(M)
(F4)
Reduced flow rate (W)
400
500
1600
Rated flow rate G30 (g/h)
76
131
255
Rated flow rate G31 (g/h)
75
129
250
10 Town gas G110 - 8 mbar
AUX
SR
UR-3c
Rated heating capacity (kW)
1.05
1.8
3.4
Nozzle diameter (1/100 mm)
145
185
315
Pre-chamber (printed on nozzle)
/8
/2
/13
Reduced flow rate (W)
400
500
1200
WARNING:
In the case of conversion to
Town Gas G110 – 8 mbar (category
1a)
, do not use the burners provided, but request the special
G110 burners kit
from our Technical Assistance Service.