C
HAPTER
3
| Installing the Switch
Installation
– 19 –
2.
Use suitable screws (not provided) to secure the brackets to the rack, as
illustrated in the following figure.
Figure 6: Mounting the Switch
3.
Connect the switch to a power source with the provided power cord. See
“Powering On” on page 19
.
P
OWERING
O
N
The SMCFS2601 switch is powered by connecting to an AC power supply using a
power cord. When powering on the switch, it automatically initializes and the
LED indicators respond as follows:
1.
All of the LED indicators flash momentarily for one second, which represents
a resetting of the system.
2.
The Power LED indicator turns on green.
Содержание SMCFS2601
Страница 1: ...USER GUIDE EZ SwitchTM 10 100 1000 24 2G Port Unmanaged Fast Ethernet Switch SMCFS2601...
Страница 6: ...COMPLIANCES AND SAFETY STATEMENTS 6...
Страница 8: ...ABOUT THIS GUIDE 8...
Страница 26: ...APPENDIX B Specifications Physical Characteristics 26...
Страница 27: ......