C
HAPTER
3
| Installing the Switch
Installation
– 18 –
4.
Upturn the switch and set in the desired location, making sure there is
enough ventilation space on all sides for proper air flow
5.
Connect the switch to a power source with the provided power cord. See
“Powering On” on page 19
.
R
ACK
I
NSTALLATION
To install the switch in an EIA standard-sized, 19-inch rack, follow the
instructions described below:
1.
Secure the supplied rack-mounting brackets to each side of the switch with
supplied screws, as illustrated in the following figure.
Figure 5: Attaching Brackets
C
AUTION
:
Avoid placing anything heavy on the switch.
Содержание SMCFS2601
Страница 1: ...USER GUIDE EZ SwitchTM 10 100 1000 24 2G Port Unmanaged Fast Ethernet Switch SMCFS2601...
Страница 6: ...COMPLIANCES AND SAFETY STATEMENTS 6...
Страница 8: ...ABOUT THIS GUIDE 8...
Страница 26: ...APPENDIX B Specifications Physical Characteristics 26...
Страница 27: ......