3-2
Installing the Switch
3
Figure 3-1 RJ-45 Connections
Equipment Checklist
After unpacking the switch, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.
Package Contents
• TigerSwitch 10/100/1000, SMC8150L2
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
• Power cord—either US, Continental Europe or UK
• Console cable (RJ-45 to DB-9)
• This Installation Guide
• Management Guide CD
Optional Rack-Mounting Equipment
If you plan to rack-mount the switches, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
R
J-45
C
onnector
Содержание 8150L2
Страница 1: ...INSTALLATION GUIDE TigerSwitchTM 10 100 1000 50 Port Gigabit Managed Switch SMC8150L2 ta ...
Страница 2: ......
Страница 12: ...viii ...
Страница 15: ...xi Contents Appendix D Ordering Information D 1 Glossary Index ...
Страница 16: ...xii Contents ...
Страница 38: ...3 8 Installing the Switch 3 ...
Страница 54: ...C 4 Specifications C ...
Страница 56: ...Ordering Information D 2 D ...
Страница 63: ......