T
WISTED
-P
AIR
D
EVICES
4-3
Network Wiring Connections
Today, the punch-down block is an integral part of many of the newer
equipment racks. It is actually part of the patch panel. Instructions for
making connections in the wiring closet with this type of equipment
follows.
1. Attach one end of a patch cable to an available port on the switch, and
the other end to the patch panel.
2. If not already in place, attach one end of a cable segment to the back
of the patch panel where the punch-down block is located, and the
other end to a modular wall outlet.
3. Label the cables to simplify future troubleshooting. See “Cable
Labeling and Connection Records” on page 4-9.
Figure 4-2 Network Wiring Connections
8.7A
8.7A
Mgmt
Mgmt
Mgmt
Mgmt
Equipment Rack
(side view)
Network Switch
Patch Panel
Punch-Down Block
Wall
Содержание 7824M/FSW
Страница 2: ......
Страница 18: ...TABLE OF CONTENTS xviii E Ordering Information E 1 Glossary Index ...
Страница 40: ...NETWORK PLANNING 2 8 ...
Страница 58: ...INSTALLING THE SWITCH 3 18 ...
Страница 68: ...MAKING NETWORK CONNECTIONS 4 10 ...
Страница 72: ...TROUBLESHOOTING A 4 ...
Страница 80: ...CABLES B 8 ...
Страница 86: ...EXTENDER MODULES C 6 ...
Страница 96: ...ORDERING INFORMATION E 2 ...
Страница 102: ...GLOSSARY Glossary 6 ...
Страница 106: ...INDEX Index 4 ...
Страница 107: ......