background image

Figure 7                                lock nut at K7

  

Technical Information 

smb

 

Carrantuohill 

Seilspielgeräte GmbH Berlin

 

Page 4 

Technikerstraße 6/8

 

 

15366 Hoppegarten 

 

Germany 

 

Phone: ++49 (0)3342  5 08 37 20 

 

Fax:     ++49 (0)3342  5 08 37 80

 

 
 

Assembling the additional element inside netting (if ordered) 

 

With the hollow balls still open, pull the marked straining screws 
into  the  corresponding 

hollow  balls  (K4  and  K7)

  via  the 

tensioning  sleeves  (size  27),  thereby  tightening  the  inside 
netting. The lock nuts (size 24) on the straining screws can then 
be tightened 

(figure 7).

 

 

Closure  of  the  open  hollow  balls  with  the  prepared  ball  covers 
completes the assembly. 
 
 
 
 
 

 

Locking the hollow balls 

 

Lock the hollow balls with the prepared ball covers. 

 

 
 
 
Maintenance instructions EN 1176-1 

 

Visual routine inspection 
 

Frequency will be based on local conditions (high/low use, vandalism, air pollution, effects of weather).

 

 

 

The surface netting should be examined for damage, especially broken strands. 

 

The cover locks for the hollow balls should be checked. 

 

 
Operational inspection (twice-yearly) 

 

 

The additional element inside netting 

(if fitted)

 should be checked for tautness. Retensioning is carried 

out  at  the  tensioning  point  by  removing  the  cover  and  increasing  the  tension  on  the  tensioning  sleeve 
(size 27). The lock nut (size 24) 

(figure 7)

 should first be loosened. Normally retensioning at the upper 

tensioning points will be sufficient 

(K4)

 

 

 
Main inspection (annual) 

In addition to the checks in the visual and operational inspection: 

 

 

Check the anchor frame for excessive corrosion (every two years). At the corners the anchor frame 
should be exposed to the installation depth and checked for corrosion. 

 

Check that the tube screw fittings have a firm, crack-free connection to the hollow balls. If a screw fitting 
is loosened, it should be re-tightened inside the ball. 

 

Check that the lock nuts 

(figure 7)

 fit firmly on the hollow balls. 

Содержание Carrantuohill

Страница 1: ...arrantuohill Ground quality With regard to the type of ground in the play area please refer to EN 1176 1 According to this sand wood chips gravel and HIC tested synthetic protective coatings are allowed We recommend a min 400 mm thick layer of gravel grain size 2 8 mm or sand grain size 0 2 2 mm If you use a synthetic protective surface it must be sure that all relevant parts for the maintenance s...

Страница 2: ...nd square This framework ensures that the frame tubes and the hollow balls can be screwed in correctly 1 Plug in frame Part 1 2 Plug in frame Part 2 3 Plug in frame Part 3 4 Tube anchor Figure 2 Anchoring frame Assembling the frame An approx 3 m long double ladder will be required for assembly The arrangement of the frame tubes and ball joints is shown in figure 3 The reference number printed on t...

Страница 3: ...ews provided figure 5 and 6 If individual rope ends should insert only with difficulty you can help yourself with an injection of silicon or oil in the ROWOCON sleeves In no case it is allowed to remove the end sleeve of the rope Then fasten the opposite side using the hemp rope to provi sionally tighten the net which will make threading and screwing down easier The two remaining sides of the net ...

Страница 4: ...llution effects of weather The surface netting should be examined for damage especially broken strands The cover locks for the hollow balls should be checked Operational inspection twice yearly The additional element inside netting if fitted should be checked for tautness Retensioning is carried out at the tensioning point by removing the cover and increasing the tension on the tensioning sleeve s...

Отзывы: