Figure 3
Arrangement of the frame tubes and ball joints
Ball joints frame tubes
1x K1
1X R1 3x R5
4x K4
1X R2 1x R6
4x K7
1x R3 4x R7
1x R4 4x R8
Technical Information
smb
Carrantuohill
Seilspielgeräte GmbH Berlin
Page 2
Technikerstraße 6/8
15366 Hoppegarten
Germany
Phone: ++49 (0)3342 5 08 37 20
Fax: ++49 (0)3342 5 08 37 80
Assembling the anchoring frame
Screw down the galvanised square tubular frame with
the plug-in system as shown in
figure 2
.
This frame must be placed in the soil at a depth of
470 mm below the play level
(figure 2)
, and must be
level and square.
This framework ensures that the frame tubes and the
hollow balls can be screwed in correctly.
1
Plug-in frame
Part 1
2
Plug-in frame
Part 2
3
Plug-in frame
Part 3
4
Tube anchor
Figure 2
Anchoring frame
Assembling the frame
An approx. 3 m long double
ladder will be required for
assembly. The arrangement
of the frame tubes and ball
joints is shown in
figure 3
.
The reference number printed
on the joints
(K4/K7)
always
points to the top of the frame
(K1)
.
After completing the preas-
sembly of the frame, but
initially only partially tightening
the screw connections, check
the correct alignment of the
ROWOCON
®
- connections
regarding the adjustment of
the nets
(see figure 4 and 5).
All the nuts can then be
tightened with the extended
socket spanner size 32.