ASSEMBLE DOOR 

SELECT: 

 

2 x 1.850 m Door Sheets 

2 x 0.945 m  Door Top/Bottom Channels 

2 x 1.850 m Door Side Channels 

3 x Hinges 

1 x Padbolt Support Flashing 

2 x 1.255 m  Door Brace Flashings 

36 x Rivets 

fig.1 

STEP 1: 

 

 

Lay out door sheets on a flat surface making sure narrow pans 

are on the outside. 

 

 

Slide door top and bottom channels on each end as shown in 

fig. 1

 

 

 

Rivet sheets together. 

STEP 2: 

 

 

Position door side flash-

ings and assemble door 

as shown. 

 

 

Drill and rivet as per dia-

gram, ensuring rivets 

penetrate into door sheet. 

 

STEP 4: 

 

 

Rivet door brace flashings onto back 

of door as shown. Where possible, 

rivet from front of door. 

 

 

Ensure the door brace flashings are 

at least 50mm from top and bottom of 

door, and 10mm from the side to 

clear top and bottom timber plate, 

when hung. 

fig.2 

STEP 3: 

 

 

Attach hinges to door side 

channel using rivets provided. 

 

 

Using one rivet, attach padbolt 

support as shown in 

fig. 2

 

NARROW PANS 

Содержание SS2515

Страница 1: ...ASSEMBLY INSTRUCTIONS SS2515 BASE SIZE 2 520m x 1 520m...

Страница 2: ......

Страница 3: ...r cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as s...

Страница 4: ...720 m 5 Barge 1 720 m 2 Door 3 4 Sheet 1 850 m 2 Padbolt Support 0 140 m 1 TIMBER Spouting 2 550 m 1 Bottom Plates H4 Green Front Back 2 520 m 2 Bottom Plates H4 Green Sides 1 520 m 2 HARDWARE Top Pla...

Страница 5: ...Bottom Plate Side Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Sheets Door Side Flashing Padbolt Support Hinge Door Brace Door Top Bottom Channel QUICK OVERVIEW 1 LAY FOUNDATION...

Страница 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Страница 7: ...fig 1 Rivet sheets together STEP 2 Position door side flash ings and assemble door as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings...

Страница 8: ...ing each side of wall sheets overhangs the end of Bottom Plate by 15mm Check that the distance between the Top and Bottom Plates is correct As per diagram in step 1 Check that the Bottom Plate is stra...

Страница 9: ...te using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Страница 10: ...re the door closes properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the top of the...

Страница 11: ...support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates together in the cor...

Страница 12: ...the Front and Back Top Plates are straight Nail the roof sheets to the front back Top Plates using 1 x nail per pan fig 2 11 STEP 4 Place Barge Flashings on roof at end of shed ensuring the diagonal t...

Страница 13: ...o the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75m...

Страница 14: ......

Страница 15: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Отзывы: