Drive Startup Manual KEB-Induction 

 

 

March 5, 2020 

©2020 Smartrise Engineering, Inc. All Rights Reserved  

Page 3 

Wiring 

A checklist must be completed during the drive wiring process. See Appendix 1 for terminal 

location. 

Power  

Perform the following to connect power. See 

C4 Controller 

sheet

 03 Machine Room

 for job 

specific information.  

 

Connect main line power to terminal blocks L1/L2/L3. 

 

Connect the ground wire to the yellow/green terminal block next to L1-L3. 

Brake  

Perform the following to connect the brakes. See 

C4 Controller 

sheet

 05 Brakes

 for job specific 

information. 

 

Connect the main brake wiring to terminal K1 / K2 and the secondary brake wiring (if 

equipped) to terminals J1 / J2 located on the terminal block next to the M Contactor. 

Motor / Encoder 

Perform the following to connect the drive to the motor and encoder cable. See 

C4 Controller 

sheet

 4 Motor

 

and Drive Connections 

for job specific information. 

 

Connect motor leads to the M contactor at T1/T2/T3. 

 

Connect the encoder cable to the encoder cable mounted on the drive. 

The table below lists the Wiring References for Common Encoders. 

Table 1: Wiring References for Common Encoders 

Encoder  Imperial / PG-X3 

Magil 

IH740 / IH950  Accucoder  Wachendorff 

Industrial 

Encoder 

(Canada) 

PWR 

Red (2) 

Red (2) 

Brown (2) 

Brown 

Brown 

Brown 

COM 

Black (1) 

Black (1) 

White (1) 

Blue 

White 

(Shield) 

White 

White (3) 

White (3) 

Green (3) 

White 

Green 

Green 

/A 

Black/White 

(6) 

Brown (6) 

Pink (6) 

Green 

Red 

Pink 

Blue (4) 

Green (4) 

Yellow (4) 

Yellow 

Yellow 

Yellow 

/B 

Red/Black (7) 

Blue (7) 

Blue (7) 

Gray 

Black 

Blue 

Orange (5) 

Yellow (5) 

Gray (5) 

 

Gray 

Gray 

/Z 

Green (8) 

Orange (8) 

Red (8) 

 

Violet 

Red 

DAT 

 

 

 

 

 

 

Содержание KEB-Induction

Страница 1: ......

Страница 2: ...Page intentionally left blank...

Страница 3: ...ent History Date Version Summary of Changes October 23 2018 1 0 Initial Submittal August 23 2019 2 0 Changed cover page New document format Added secondary brake wiring December 12 2019 3 0 Updated Ac...

Страница 4: ...Drive Startup Manual KEB Induction Page ii 2020 Smartrise Engineering Inc All Rights Reserved March 5 2020 Page intentionally left blank...

Страница 5: ...EB Motor Learn 6 Initial Setup 6 Encoder Synchronization 7 Operation 7 No Faults 7 Proper Direction 7 At Speed 7 Under Control 7 Troubleshooting 8 Drive Fault Encoder Fault 8 Brake Not Lifting 8 Wrong...

Страница 6: ...ll Rights Reserved March 5 2020 List of Figures Figure 1 KEB Induction Drive 1 Figure 2 Example of Parameter Table 1 Figure 3 Ground Bus Terminal 2 Figure 4 Example of Construction Wiring 5 Figure 5 B...

Страница 7: ...Drive Startup Manual KEB Induction March 5 2020 2020 Smartrise Engineering Inc All Rights Reserved Page v List of Tables Table 1 Wiring References for Common Encoders 3 Table 2 Parameter Groups 11...

Страница 8: ...Drive Startup Manual KEB Induction Page vi 2020 Smartrise Engineering Inc All Rights Reserved March 5 2020 Page intentionally left blank...

Страница 9: ...rive Equipment Settings Verification Set and verify the equipment matches the job specific parameters for proper operation See C4 Controller sheet 01 Getting Started Parameter Table for more informati...

Страница 10: ...of the controller Examples of a proper building to controller ground is as follows Attach the ground wire to the street side of a water main Attach the ground wire to a grounding rod in the pit The c...

Страница 11: ...the terminal block next to the M Contactor Motor Encoder Perform the following to connect the drive to the motor and encoder cable See C4 Controller sheet 4 Motor and Drive Connections for job specif...

Страница 12: ...r job specific information Connect a jumper from L120 to terminals LFT LFM and LFB a If rear doors are used connect LRT LRM and LRB Connect a jumper from H120 to PIT BUF BFL and TFL If secondary brake...

Страница 13: ...Drive Startup Manual KEB Induction March 5 2020 2020 Smartrise Engineering Inc All Rights Reserved Page 5 Figure 4 Example of Construction Wiring...

Страница 14: ...defaults to properly communicate with the controller After factory testing customer motor data from customer s EDF is programmed into the drive to provide an easier out of box installation Initial Se...

Страница 15: ...list during the verification process No Faults Make sure the car is moving without triggering a fault either on the Smartrise SRU Board or the drive If the SRU Board displays a drive fault look at the...

Страница 16: ...nection and if there is a second brake installed verify that the EB terminal is jumpered to the terminal See the C4 Controller sheet 01 Getting Started for more information If the brake has the proper...

Страница 17: ...B Induction March 5 2020 2020 Smartrise Engineering Inc All Rights Reserved Page 9 Appendix 1 Terminal and Encoder Card Locations The figure below shows the terminal and Encoder card locations Figure...

Страница 18: ...Drive Startup Manual KEB Induction Page 10 2020 Smartrise Engineering Inc All Rights Reserved March 5 2020 Figure 7 Encoder Card Location...

Страница 19: ...tings LE01 LE36 Encoder Data Defines the settings and scalings of the drive encoders LN01 LN05 Machine Data Defines the machine data including sheave diameter roping ratio and rated load values LS01 L...

Страница 20: ...ed navigate to PM Induction Geared and load Induction Gearless and Save Go to step 4 After this value is saved go back and load the original configuration as Gearless This does a complete background d...

Отзывы: