background image

 

Содержание KEB-Induction

Страница 1: ......

Страница 2: ...Page intentionally left blank...

Страница 3: ...ent History Date Version Summary of Changes October 23 2018 1 0 Initial Submittal August 23 2019 2 0 Changed cover page New document format Added secondary brake wiring December 12 2019 3 0 Updated Ac...

Страница 4: ...Drive Startup Manual KEB Induction Page ii 2020 Smartrise Engineering Inc All Rights Reserved March 5 2020 Page intentionally left blank...

Страница 5: ...EB Motor Learn 6 Initial Setup 6 Encoder Synchronization 7 Operation 7 No Faults 7 Proper Direction 7 At Speed 7 Under Control 7 Troubleshooting 8 Drive Fault Encoder Fault 8 Brake Not Lifting 8 Wrong...

Страница 6: ...ll Rights Reserved March 5 2020 List of Figures Figure 1 KEB Induction Drive 1 Figure 2 Example of Parameter Table 1 Figure 3 Ground Bus Terminal 2 Figure 4 Example of Construction Wiring 5 Figure 5 B...

Страница 7: ...Drive Startup Manual KEB Induction March 5 2020 2020 Smartrise Engineering Inc All Rights Reserved Page v List of Tables Table 1 Wiring References for Common Encoders 3 Table 2 Parameter Groups 11...

Страница 8: ...Drive Startup Manual KEB Induction Page vi 2020 Smartrise Engineering Inc All Rights Reserved March 5 2020 Page intentionally left blank...

Страница 9: ...rive Equipment Settings Verification Set and verify the equipment matches the job specific parameters for proper operation See C4 Controller sheet 01 Getting Started Parameter Table for more informati...

Страница 10: ...of the controller Examples of a proper building to controller ground is as follows Attach the ground wire to the street side of a water main Attach the ground wire to a grounding rod in the pit The c...

Страница 11: ...the terminal block next to the M Contactor Motor Encoder Perform the following to connect the drive to the motor and encoder cable See C4 Controller sheet 4 Motor and Drive Connections for job specif...

Страница 12: ...r job specific information Connect a jumper from L120 to terminals LFT LFM and LFB a If rear doors are used connect LRT LRM and LRB Connect a jumper from H120 to PIT BUF BFL and TFL If secondary brake...

Страница 13: ...Drive Startup Manual KEB Induction March 5 2020 2020 Smartrise Engineering Inc All Rights Reserved Page 5 Figure 4 Example of Construction Wiring...

Страница 14: ...defaults to properly communicate with the controller After factory testing customer motor data from customer s EDF is programmed into the drive to provide an easier out of box installation Initial Se...

Страница 15: ...list during the verification process No Faults Make sure the car is moving without triggering a fault either on the Smartrise SRU Board or the drive If the SRU Board displays a drive fault look at the...

Страница 16: ...nection and if there is a second brake installed verify that the EB terminal is jumpered to the terminal See the C4 Controller sheet 01 Getting Started for more information If the brake has the proper...

Страница 17: ...B Induction March 5 2020 2020 Smartrise Engineering Inc All Rights Reserved Page 9 Appendix 1 Terminal and Encoder Card Locations The figure below shows the terminal and Encoder card locations Figure...

Страница 18: ...Drive Startup Manual KEB Induction Page 10 2020 Smartrise Engineering Inc All Rights Reserved March 5 2020 Figure 7 Encoder Card Location...

Страница 19: ...tings LE01 LE36 Encoder Data Defines the settings and scalings of the drive encoders LN01 LN05 Machine Data Defines the machine data including sheave diameter roping ratio and rated load values LS01 L...

Страница 20: ...ed navigate to PM Induction Geared and load Induction Gearless and Save Go to step 4 After this value is saved go back and load the original configuration as Gearless This does a complete background d...

Отзывы: