HEM4000 Engine Controller User Manual Page 41 of 46
11
COMMISSIONING
Before formal operation, following examinations are suggested:
a)
Ensure all the connections are correct and wire diameter is suitable.
b)
Ensure the DC power of the controller is equipped with fuse and that it is correctly connected with the
passive and negative anodes of the starter battery.
c)
Take proper measures to stop engine to crank successfully (e. g.: remove the connection wire of the
fuel valve.). Make sure everything is correct and power on the starter battery, then the controller shall
conduct program.
d)
Press “Start” button, and the engine shall start. After the starting times set, the controller shall give out
starting failure signal. Press “Stop” button and the controller shall recover.
e)
Recover the actions that stop the engine to start successfully (recover the connection wire of the fuel
valve.), and press the “Start” button again and the engine shall start. If everything is Ok, the engine
shall work from idle speed running (if there is idle speed set) to normal running. During this period,
please observe the working situation of the engin
e.
f)
If there is any other question, please contact SmartGen’s service personnel.