HAT828 High Speed ATS Controller User Manual Page 21 of 56
Scheduled Run Off Load:
When the input is active, mains close relay will active after mains is
normal.
Cycle time of Scheduled Run can be set as start monthly, weekly and daily.
Run Monthly:
Which month to start, start date and time can be set.
Run Weekly:
Can start the genset at the same time in couple days of a week. Eg. Start the genset
at 8:00 a.m. from Monday to Friday and keep 10 hours.
Run Daily:
Can start the genset at same time everyday.
7.2.4
SCHEDULED NOT RUN
Once “Scheduled Not Run” enables, users can set the “Scheduled Not Start” time. Start signal will
be deactivated at preset time and it will be inhibited before the delay has expired.
Cycle time of “Scheduled Not Run” can be set as monthly, weekly and daily.
Not Run Monthly:
Which month not start, not start
date and time can be set.
Not Run Weekly:
Can not start the genset at the same time in couple days of a week. Eg. Not
Start the genset at 19:00 p.m. from Monday to Friday and keep 12 hours.
Not Run Daily:
Can not start the genset at same time everyday.
NOTE3:
“Scheduled Not Run”
operation is prior to “Scheduled Run” operation.