Longo programmable controller LPC-2.MC8

CANopen unit

CANopen unit consists of Master and Slave communication ports. They are independent, thus can be
connected to two different CAN networks at the same time. 

The ports can operate at baud rates 50 kbps, 125 kbps or 250 kbps.

It   follows   the   internationally   standardized   (EN   50325-4)   CAN-based   higher-layer   protocol   for
embedded control systems. Advised rules and concepts by this standard must be followed to fulfill
the conditions and so achieving normal operation and results.

The structure of the network as cable type and lengths, baud rates, number of the nodes and
termination   must   be   taken   into   account   within   the   recommendations   and   requirements,   when
designing the network.

The bus network can consist of at least one Master and at list one Slave node by the standard, but it
is advised that with increased number of nodes, the Master node fastest interval is extended. Below
are two examples: 

Example1

:  network with 1 master and 9 slaves, every slave have defined 32 (4x8) byte of data and

baud rate 125 Kbps. Fastest Cycle time for this configuration is 50 ms.

Example2

:  network with 1 master and 4 slaves, every slave have defined 4 byte of data and baud

rate 250 Kbps. Fastest Cycle time for this configuration is 5 ms. 

5 millisecond is the fastest recommended cycle time.

It is recommended to power-up all the nodes on the same network at the same time, if some or all
nodes had been reprogrammed (to reinitialize the communication properly).

Additional operational information

After the installation of the PLC it must be at least 20 minute enabled power supply, before the
internal battery is charged and the retain memory is ready to save variables without loosing them
switching power supply off. 

RUN / STOP Switch

Run mode: Status (RUN) LED on indicate that the PLC program is up and user program is running.

Stop mode:  When the switch is turn to STOP state, the status (RUN) LED is Off. The application
switch to the bootloader, this fact allow users to program LPC-2.MC8.

When the user is done programming the PLC via USB the switch must be turned ON and the MC8
starts the application.   

PLC task cycle time

Main PLC task interval (under Project tab -> Resource   Tasks   Interval) time is not recommended

to be set lower than 50 ms.

5

Содержание LONGO LPC-2

Страница 1: ...USER MANUAL Longo programmable controller LPC 2 MC8 Main module Version 10 SMARTEH d o o Poljubinj 114 5220 Tolmin Slovenia Tel 386 0 388 44 00 e mail info smarteh si www smarteh si...

Страница 2: ...Longo programmable controller LPC 2 MC8 Written by SMARTEH d o o Copyright 2018 SMARTEH d o o User Manual Document Version 10 April 2018 i...

Страница 3: ...ot include damage due to transport or because of unconsidered corresponding regulations of the country where the module is installed This device must be connected properly by the provided connection s...

Страница 4: ...able controller LPC 2 MC8 1 ABBREVIATIONS 1 2 DESCRIPTION 2 3 FEATURES 3 4 OPERATION 4 5 INSTALLATION 6 5 1 Connection scheme 6 5 2 Mounting instructions 8 5 3 Module labeling 10 6 TECHNICAL SPECIFICA...

Страница 5: ...appeareance in document IDE Integrated development environment TCP Transmission control protocol CAN Controller area network RFID Radio frequency identification IR Infrared RTC Real time clock PLC Pro...

Страница 6: ...t for network connectivity Main module is powered from main power supply Main module is accompanied with Smarteh IDE application It is a tool where various modules can be put together to a configurati...

Страница 7: ...CP slave server functionality USB port for Debugging Application and Default parameters transfer CAN ports RS 485 connectivity for intelligent peripheral modules thermostat RFID IR operator terminal I...

Страница 8: ...fault 0 0 0 0 Flash memory unit This unit enables only reading from its variables Setting the variables is issued with one of Smarteh IDE plugins Flash uploader page Flash unit provides reading of a p...

Страница 9: ...and baud rate 125 Kbps Fastest Cycle time for this configuration is 50 ms Example2 network with 1 master and 4 slaves every slave have defined 4 byte of data and baud rate 250 Kbps Fastest Cycle time...

Страница 10: ...Longo programmable controller LPC 2 MC8 5 INSTALLATION 5 1 Connection scheme Figure 2 Connection scheme 6...

Страница 11: ...pplication not running connected modules outputs in their off state RST when moved from STOP to RUN mode PLC is reset and application starts from its beginning S2 CAN bus termination ON corresponding...

Страница 12: ...erator It should be marked as the disconnecting device for the equipment All connections module attachments and assembling must be done while module is not connected to the main power supply Wires con...

Страница 13: ...derivation code 001 version code reserved for future HW and or SW firmware upgrades 3 D C 16 11 is the date code 16 week and 05 year of production Label 2 descriptions 1 S N MC8 S9 1100000190 is the s...

Страница 14: ...B connector type device mode Low speed Full speed RTC capacitor backed up with retention cca 30 days Dimensions L x W x H 90 x 53 x 77 mm Weight 180 g Ambient temperature 0 to 50 C Ambient humidity m...

Страница 15: ...ogrammable controller LPC 2 MC8 7 SPARE PARTS For ordering spare parts following Part Numbers should be used LPC 2 MC8 main module LPC 2 MC8 P N 225MC813001001 Programmable cable USB PMU P N 203PMU120...

Страница 16: ...7 9 Technical data update 17 12 15 8 LPC Manager Smarteh IDE 01 09 15 7 Technical data update 01 06 14 6 Technical data update CANOpen Unit section added 01 05 13 5 Technical data update Modbus sectio...

Страница 17: ...Longo programmable controller LPC 2 MC8 13...

Страница 18: ...Longo programmable controller LPC 2 MC8 9 NOTES 14...

Отзывы: