![SMAR LD291 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/smar/ld291/ld291_operation-and-maintenance-instruction-manual_1294938017.webp)
Installation
1.9
The electronic housing can be rotated to adjust the digital display on a better position. To rotate it,
loose the Housing Rotation Set Screw, see Figure 1.4 (a). To prevent humidity entering, the electric
housing and the sensor joint must have a minimum of 6 fully engaged threads. The provided joint
allows 1 extra turn to adjust the position of the display window by rotating the housing clockwise. If the
thread reaches the end before the desired position, then rotate the housing counterclockwise, but not
more than one thread turn. Transmitters have a stopper that restricts housing rotation to one turn. See
Section 4, Figure 4.1.
COVER
LOCKING
SCREW
(a)
(b)
Figure 1.4 - Cover Locking and Housing Rotating Set Screw (a) Electronic Board Side
(b) Terminal Connection Side
Wiring
To release the cover that gives access to the wiring block, turn the cover locking screw clock wise, see
the direction of the arrow in the figure 1.4.
Test
and
Communication terminals
allow, respectively, to measure the current in the 4 - 20 mA loop,
without opening it, and to communicate with the transmitter. To measure it, connect a multimeter in the
mA scale in the "
-
" and "
+
" terminals, and to communicate, use a
HART
configurator in the "
COMM
"
and "
-
" terminals. The wiring block has screws on which fork or ring-type terminals can be fastened.
See Figure 1.6.
Figure 1.5– Wiring Block
The
LD291
is protected against reverse polarity
For convenience there are two ground terminals: one inside the cover and one external, located close
to the conduit entries.
Use of twisted pair (22 AWG or greater than) cables is recommended. Avoid routing signal wiring close
to power cables or switching equipment.
The Figure 1.6 shows the correct installation of the conduit, to avoid penetration of water, or other
substance, which may cause malfunctioning of the equipment.
COMUNICATION
TERMINAL
LOC
TES
COM
+
TES
TERMINAL
GROUND
TERMINA
Содержание LD291
Страница 1: ...INTELLIGENT PRESSURE TRANSMITTER LD291 Version 6 MAR 12 L D 2 9 1 M E ...
Страница 8: ...LD291 Operation and Maintenance Instruction Manual VIII ...
Страница 11: ...Installation 1 3 Figure 1 1 b Dimensional Drawing and Mounting Position for LD291 Sanitary ...
Страница 13: ...Installation 1 5 Figure 1 1 d Dimensional Drawing and Mounting Position for LD291 Level ...
Страница 36: ...LD291 Operation and Maintenance Instruction manual 3 10 ...
Страница 58: ...LD291 Operation and Maintenance Instruction Manual 5 12 ...
Страница 70: ...LD291 Operation Maintenance Instruction Manual 6 12 ...
Страница 74: ...LD291 Certifications Information A 4 NEMKO and DMT CEPEL ...
Страница 76: ...LD291 Certifications Information A 6 CEPEL ...
Страница 78: ...LD291 Certifications Information A 8 FM ...
Страница 79: ...Appendix A A 9 NEMKO ...
Страница 80: ...LD291 Certifications Information A 10 ...
Страница 82: ...LD291 Service Request Form B 2 ...