![SMA SUNNY ISLAND SIC40-MPT Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/sma/sunny-island-sic40-mpt/sunny-island-sic40-mpt_technical-description_1294206031.webp)
SMA Solar Technology AG
(First) Commissioning
Technical Description
SIC40-TEN081110
31
6 (First) Commissioning
6.1 Configuration of the Charge Controller
Configure the charge controller before commissioning. You can carry out the basic configuration
using the operating switch (DIL switch).
The operating mode, battery system, battery type, device address of the charge controller and a
fault diagnosis can be configured by changing the switch position of the DIL switch.
Assignment of the DIL Switch
The DIL switches have the following assignment:
6.1.1 Operating Mode
The operating mode is set using the "D4" DIL switch.
The following table displays the switch position for the required operating mode.
Operation with Sunny Island 3324/4248
If the charge controller is operated in the stand-alone grid system with a
Sunny Island 3324/4248, the "Stand-alone" operating mode must be selected, since
this Sunny Island does not support the communication type of the charge controller.
Switch
SMA operation
(operation with Sunny Island)
Stand-alone operation
D4
ON
OFF
Содержание SUNNY ISLAND SIC40-MPT
Страница 1: ...Charge controller SUNNY ISLAND CHARGER Technical Description SIC40 TEN081110 98 2005210 Version 1 0 EN...
Страница 2: ......
Страница 6: ...SMA Solar Technology AG 6 SIC40 TEN081110 Technical Description...
Страница 48: ...Contact SMA Solar Technology AG 48 SIC40 TEN081110 Technical Description...
Страница 49: ...SMA Solar Technology AG Contact Technical Description SIC40 TEN081110 49...
Страница 50: ...Contact SMA Solar Technology AG 50 SIC40 TEN081110 Technical Description...