SMA
Technologie AG
Overview
Installation Guide
SB25_30-11:SE0307
Page 11
4 Overview
4.1 Unit Description
The following diagram gives a schematic overview of the various components and
connection points inside the Sunny Boy with the cover removed:
Varistors, section 9
Communication socket (RS232, RS485, NLM
Piggy-Back, radio), section 11
Sunny Display
Operating status
LEDs
Jumper slot for
communication
Communication socket
Plug socket (AC),
section 6.2.1
PE (protective earth) connector for cover
Flat plug connection for grounding the cable shield for
RS232 and RS485 communication
PV input plugs (DC), section 6.2.2
Housing feed-through for the optional Electronic Solar Switch
Содержание Sunny Boy SB 2500
Страница 2: ......
Страница 6: ...Explanation of the Symbols Used SMA Technologie AG Page 6 SB25_30 11 SE0307 Installation Guide...
Страница 10: ...Safety Instructions SMA Technologie AG Page 10 SB25_30 11 SE0307 Installation Guide...
Страница 20: ...Installation Requirements SMA Technologie AG Page 20 SB25_30 11 SE0307 Installation Guide...
Страница 34: ...Opening and Closing the Sunny Boy SMA Technologie AG Page 34 SB25_30 11 SE0307 Installation Guide...
Страница 58: ...Rating for a Line Circuit Breaker SMA Technologie AG Page 58 SB25_30 11 SE0307 Installation Guide...
Страница 62: ...The Communication Interface SMA Technologie AG Page 62 SB25_30 11 SE0307 Installation Guide...
Страница 65: ......