6.2.2 PV String (DC) Connection
To connect up the input, follow these steps:
1.
Make sure the PV generator connectors have
the right polarity and do not exceed the
maximum string voltage of 600 V (DC). See
also section 5.2 "PV Generator Requirements"
(Page 15).
2.
Taking one DC plug connector at a time,
measure the direct current voltage between one
DC plug connector of a string and ground
potential.
3.
If the measured voltages are constant and their
total is roughly the same as the open circuit
voltage of the string, then there is a ground fault
in this string. Its approximate location can be
deduced from the relationships between the
voltages.
4.
Repeat points 2 and 3 for each string.
5.
Connect up the faultless PV generator strings to
the inverter.
6.
Close the unused DC input sockets with the caps
included in the delivery.
Warning!
Dangerously high voltages may be present. Danger of death!
Warning!
Do not connect strings to the Sunny Boy that contain a ground fault until
you have fixed the ground fault in the PV generator!
Содержание Sunny Boy SB 2500
Страница 2: ......
Страница 6: ...Explanation of the Symbols Used SMA Technologie AG Page 6 SB25_30 11 SE0307 Installation Guide...
Страница 10: ...Safety Instructions SMA Technologie AG Page 10 SB25_30 11 SE0307 Installation Guide...
Страница 20: ...Installation Requirements SMA Technologie AG Page 20 SB25_30 11 SE0307 Installation Guide...
Страница 34: ...Opening and Closing the Sunny Boy SMA Technologie AG Page 34 SB25_30 11 SE0307 Installation Guide...
Страница 58: ...Rating for a Line Circuit Breaker SMA Technologie AG Page 58 SB25_30 11 SE0307 Installation Guide...
Страница 62: ...The Communication Interface SMA Technologie AG Page 62 SB25_30 11 SE0307 Installation Guide...
Страница 65: ......