Default setting:
• SB 3600SE-10: 100%
• SB 5000SE-10: 100%
Procedure:
1. Ensure that the firmware version of the inverter is at least 2.4.0.R. If necessary, carry out a
firmware update.
2. Select the parameter
Fallback act power lmt P in % of WMax for absent act power lmt
and set the required percentage.
3. Select the parameter
Operating mode for absent plant control
and set to
Use fallback
setting
.
8.9 Ensuring Communication with the Purchased Electricity
Meter
Communication with the purchased electricity meter must only be ensured for a system with Sunny
Boy Smart Energy and SMA Energy Meter. If you are operating an Integrated Storage System and
have created a Sunny Home Manager system in Sunny Portal, this action will not be required.
The basic procedure for changing operating parameters is explained in another section (see
Section 8.5, page 46).
Procedure:
• Check whether the parameter
Speedwire meter status
is showing
Ok
.
If the parameter is showing
Ok
, the inverter has detected the purchased electricity meter and
set up communication.
If the parameter is not showing
Ok
, the inverter has not detected the purchased electricity
meter. The purchased electricity meter must be detected.
– Select the parameter
Speedwire meter serial no.
and enter the serial number of the
purchased electricity meter.
8.10 Deactivating Grounding Conductor Monitoring
If the inverter is to be installed in an IT network or another grid configuration in which deactivation
of the grounding conductor monitoring is required, deactivate the grounding conductor monitoring
as follows.
The basic procedure for changing operating parameters is explained in another section (see
Section 8.5, page 46).
Procedure:
• Set the parameter
PE connection monitoring
or
PEOpnMon
to
Aus
or
Off
.