Operating Manual
SUNNY BOY 3600 / 5000 SMART ENERGY
BATTERY PACK SMART ENERGY
SB36-50SE-BE-en-11 | 98-112900.02 | Version 1.1
AMERICAN ENGLISH
Страница 1: ...Operating Manual SUNNY BOY 3600 5000 SMART ENERGY BATTERY PACK SMART ENERGY SB36 50SE BE en 11 98 112900 02 Version 1 1 AMERICAN ENGLISH...
Страница 2: ...that a product or symbol is not trademarked The BLUETOOTH word mark and logos are registered trademarks of Bluetooth SIG Inc and any use of these marks by SMA Solar Technology AG is under license Mod...
Страница 3: ...of the Connection Areas 27 6 1 1 View from Below 27 6 1 2 Interior View 28 6 2 AC Connection 28 6 2 1 Requirements for the AC Connection 28 6 2 2 Connecting the Inverter to the Utility Grid 30 6 2 3...
Страница 4: ...ase of PV System Control Failure 48 8 9 Ensuring Communication with the Purchased Electricity Meter 49 8 10 Deactivating Grounding Conductor Monitoring 49 8 11 Setting SMA OptiTrac Global Peak 50 9 Op...
Страница 5: ...12 Accessories 62 13 Contact 63 14 EC Declaration of Conformity 66 Table of Contents SMA Solar Technology AG Operating Manual 5 SB36 50SE BE en 11...
Страница 6: ...e Document type SMA Smart Home The System Solution for More Independence Planning Guidelines SUNNY BOY 3600 5000 SMART ENERGY BATTERY PACK SMART ENERGY Service Manual SMA Energy Meter Installation Man...
Страница 7: ...requirement for meeting a specific goal Desired result A problem that might occur Nomenclature Complete designation Designation in this document Battery Pack Smart Energy Battery Pack Sunny Boy 3600 5...
Страница 8: ...eir coupling capacity does not exceed 1 4 F for information on how to calculate the coupling capacity see the Technical Information Leading Leakage Currents at www SMA Solar com The product must only...
Страница 9: ...t personal injury and property damage and to ensure long term operation of the product read this section carefully and follow all safety precautions at all times Danger to life due to high voltages of...
Страница 10: ...tive surfaces so that there is continuous conduction Observe the applicable local regulations Risk of chemical burns from electrolyte or toxic gases During normal operation no electrolyte can leak fro...
Страница 11: ...electronic components can cause damage to or destroy the inverter through electrostatic discharge Ground yourself before touching any component Damage to the display or the type label due to the use...
Страница 12: ...ith two hole cable support sleeve F 1 Cable gland M32x1 5 with one hole cable support sleeve G 2 Counter nut for cable gland M32x1 5 H 4 Positive DC connector I 4 Negative DC connector K 8 Sealing plu...
Страница 13: ...sition Designation A Protective cover of the Battery Pack B Battery Pack C Enclosure lid D Inverter type label The type label uniquely identifies the inverter You will require the information on the t...
Страница 14: ...Pack You will require the infor mation on the type label to use the Battery Pack safely and when seeking cus tomer support from the SMA Service Line You will find the following informa tion on the ty...
Страница 15: ...es not have a transformer Alternating current WEEE designation Do not dispose of the product together with the household waste but in accordance with the locally applicable disposal regulations for el...
Страница 16: ...verter Risk of chemical burns Risk of explosion Risk of injury when lifting the Battery Pack The Battery Pack is heavy see Section 11 Technical Data page 57 Take care when lifting and transporting th...
Страница 17: ...ating range such as may occur particularly with partially shaded strings SMA OptiTrac Global Peak is enabled by default Multifunction Relay You can configure the multi function relay for various opera...
Страница 18: ...he loads can be supplied with self generated energy and for example switches the loads which are connected to SMA radio controlled sockets The Sunny Home Manager transmits specifications to the Sunny...
Страница 19: ...ions Transmission of data to Sunny Portal F Sunny Portal Internet portal for monitoring and visualization of the PV system and user inter face for the configuration of the Sunny Home Manager and the S...
Страница 20: ...y Boy Smart Energy can transmit the operating data directly to Sunny Portal In Sunny Portal you can monitor the PV system and visualize the operating data Figure 4 Overview of a system with Sunny Boy...
Страница 21: ...ter I SMA Energy Meter Measuring device which detects electrical measured values at the connection point and makes them available via Speedwire The SMA Energy Meter is a net feed in and purchased elec...
Страница 22: ...o children A solid flat support surface e g concrete or masonry must be available for mounting When mounted on drywall or similar materials the inverter emits audible vibrations during operation which...
Страница 23: ...ate heat dissipation will be ensured This will prevent any reduction in the power of the inverter or the Battery Pack as a result of excessive temperature details of temperature derating of the invert...
Страница 24: ...tween the inverters and ensure sufficient fresh air supply Figure 6 Recommended clearances Permitted and prohibited mounting positions The inverter must be mounted in one of the permitted positions Th...
Страница 25: ...e inverter and Battery Pack are heavy see Section 11 Technical Data page 57 There is risk of injury if the inverter or Battery Pack is lifted incorrectly or dropped during transport or when attaching...
Страница 26: ...anchors into the drill holes if necessary 6 Fasten the wall mounting bracket horizontally to the wall using five screws and washers 7 Hook the inverter into the right hand side of the wall mounting b...
Страница 27: ...connection to the multifunction relay B Enclosure opening with filler plug for the data cable C USB pin connector for service purposes e g firmware update D Enclosure opening for the AC cable E Posit...
Страница 28: ...irements External diameter 12 mm to 21 mm Maximum conductor cross section 10 mm Insulation stripping length 18 mm The cable must be dimensioned in accordance with the local and national directives for...
Страница 29: ...ate the grounding conductor monitoring This is necessary for example in an IT system if there is no neutral conductor present and you intend to install the inverter between two line conductors If you...
Страница 30: ...e gland and lead the AC cable through 7 If the outer diameter of the cable is between 15 mm and 21 mm remove the inner sealing ring from the cable gland 8 Push the safety levers of the AC connecting t...
Страница 31: ...grounding cable insulation If you are using a grounding cable with double insulation strip the outer insulation by 120 mm 2 Release the screw using an Allen key AF 5 until the grounding cable can be l...
Страница 32: ...on option Integrated Storage System example Figure 11 Connection option Sunny Boy Smart Energy and SMA Energy Meter example Required material not included in the scope of delivery Two network cables 6...
Страница 33: ...hout separating strip at least 200 mm For installation with aluminum separating strip at least 100 mm For installation with steel separating strip at least 50 mm SMA Energy Meter and inverter must be...
Страница 34: ...les must be connected to each string All PV modules must be aligned identically All PV modules must have the same tilt angle The maximum input current per string must be maintained and must not exceed...
Страница 35: ...d that it cannot be accidentally reconnected 2 If the enclosure lid is mounted remove it as follows Turn the DC load break switch towards OFF until it snaps into place at position O Unscrew all the sc...
Страница 36: ...wivel nut up to the thread Insert the sealing plug into the DC connector Tighten the DC connector torque 2 Nm Insert the DC connectors with sealing plugs into the corresponding DC inputs on the invert...
Страница 37: ...the adhesive tape from the plugs 4 Insert the power cable plug in the pin connector for the power cable making sure that the white markings on the plug and the pin connector are aligned Turn the plug...
Страница 38: ...s it will go 9 Position the protective cover over the Battery Pack The tabs on the right hand side of the protective cover must engage with the guides on the left of the inverter enclosure Finally pre...
Страница 39: ...or purpose with the corresponding display language within the first ten feed in hours via the rotary switches in the inverter After the first ten feed in hours the country data set can only be changed...
Страница 40: ...be correctly mounted The circuit breaker must be correctly rated All cables must be completely and correctly connected Unused DC inputs must be sealed using the corresponding DC connectors and sealing...
Страница 41: ...alternates between the firmware version the serial number of the inverter the IP address the subnet mask the serial number of the Battery Pack the configured country data set and the display language...
Страница 42: ...y data sets mentioned above A report for entering the test results according to CEI 0 21 must be available The inverter must be in operation and in the start up phase Procedure 1 As soon as the config...
Страница 43: ...t breaker and secure it against reconnection 2 If the multi function relay is used switch off the load supply voltage if necessary 3 Turn the DC load break switch towards OFF until it snaps into place...
Страница 44: ...and PV system time with Sunny Explorer or Sunny Portal Manual of the respective commu nication product at www SMA Solar com 6 If it is likely that the battery cannot be charged for a cer tain time dur...
Страница 45: ...commissioning This can take up to five minutes 8 3 Integrating the Inverter into the Network If the router supports DHCP and DHCP is enabled the inverter will automatically be integrated into the netw...
Страница 46: ...e a Sunny Home Manager system in Sunny Portal or add the inverter and the SMA Energy Meter to an existing Sunny Home Manager system see the User Manual Sunny Home Manager in Sunny Portal at www SunnyP...
Страница 47: ...must be available see Certificate Order Form for the SMA Grid Guard Code at www SMA Solar com Procedure 1 Access Sunny Explorer and log in as an installer or user 2 If required enter the SMA Grid Gua...
Страница 48: ...00 W Procedure Select the parameter Avg eff power lim grid conn pt and set the total aggregate active power limit of all inverters present in the PV system 8 8 Setting the Active Power Limitation in c...
Страница 49: ...ection see Section 8 5 page 46 Procedure Check whether the parameter Speedwire meter status is showing Ok If the parameter is showing Ok the inverter has detected the purchased electricity meter and s...
Страница 50: ...anging Operating Parameters page 46 Procedure Select the parameter Cycle time of the OptiTrac Global Peak algorithm or MPPShdw CycTms and set the required time interval The ideal time interval is usua...
Страница 51: ...t been met Red LED glowing Error The red LED indicates an error for troubleshoot ing see service manual at www SMA Solar com Blue LED No function 9 2 Display Overview Figure 13 Layout of the display e...
Страница 52: ...error on the utility grid side H Output voltage or output current of a line conductor I Event number of an error in the inverter K Grid relay If the grid relay is closed the inverter is feeding into t...
Страница 53: ...required during operation Tap on the enclosure lid twice The display alternates between device type firmware version serial number or designation of the inverter IP address subnet mask serial number o...
Страница 54: ...he last screw the enclosure lid could fall off Remove all screws of the enclosure lid using an Allen key AF 5 When removing the last screw support the enclosure lid with one hand Then remove the enclo...
Страница 55: ...DC contact protection up and press firmly until it snaps into place 14 Use a current clamp to ensure that no current is present in the DC cables 15 Release and remove all DC connectors To do this ins...
Страница 56: ...o voltage is present between any of the terminals on the multifunction relay and PE on the AC connecting terminal plate 20 Damage to the inverter due to electrostatic discharge Touching electronic com...
Страница 57: ...ter into the system for max 1 ms 1 5 kA 1 5 kA Number of independent MPP inputs 2 2 Strings per MPP input 2 2 in accordance with IEC 62109 2 ISC PV AC Output SB 3600SE 10 SB 5000SE 10 Rated power at 2...
Страница 58: ...0 8 overexcited 0 8 underexcited to 1 to 0 8 overexcited Feed in phases 1 1 Connection phases 1 1 Overvoltage category in accordance with IEC 60664 1 III III depending on the configured country data s...
Страница 59: ...g the Sunny Portal live interface 600 kB hour Topology transformerless Cooling concept Convection Degree of protection in accordance with IEC 60529 IP54 Protection class in accordance with IEC 62103 I...
Страница 60: ...lative humid ity non condensing 95 Maximum operating altitude above mean sea level MSL 2 000 m Typical noise emission 25 dB A Cooling concept Convection Degree of protection in accordance with IEC 605...
Страница 61: ...ccordance with IEC 60721 3 2 Class 2K3 Temperature range 30 C to 45 C Relative humidity non condensing 5 to 95 11 6 Equipment DC connection SUNCLIX DC connector AC connection Spring cage terminal Disp...
Страница 62: ...ny Home Manager wireless PV system monitoring and intelligent energy manage ment HM BT 10 Sunny Home Manager incl SMA radio con trolled sockets Set consisting of Sunny Home Manager and two SMA radio c...
Страница 63: ...ettings of the inverter if applicable Type and number of PV modules connected Mounting location and altitude of the inverter Three digit or four digit event number and display message of the inverter...
Страница 64: ...Power Solutions Onduleurs 33 472 09 04 40 Communication 33 472 09 04 41 Hybrid Energy Solutions Sunny Island 33 472 09 04 42 Power Plant Solutions Sunny Central 33 472 09 04 43 India SMA Solar India P...
Страница 65: ...SMA Solar UK Ltd Milton Keynes 44 1908 304899 SMA Hellas AE 801 222 9 222 International 30 212 222 9 222 SMA Solar Thailand Co Ltd 66 2 670 6999 SMA Technology Korea Co Ltd 82 2 508 8599 971 2 234 617...
Страница 66: ...echnology AG confirms herewith that the inverters described in this document are in compliance with the fundamental requirements and other relevant provisions of the above mentioned directives The ent...
Страница 67: ......
Страница 68: ...SMA Solar Technology www SMA Solar com...