SMA Solar Technology AG
6 Electrical Connection
Installation Manual
SB13_21TL-IA-en-65
27
6.3.2 Connecting the Inverter to the Electricity Grid
Figure 10: Overview of the AC coupling socket
Requirements:
☐ The display language must be set to the required language (see Section 7.3 "Changing the
☐ The connection requirements of the network operator must be met.
☐ The mains voltage must be within the permissible range. The exact operating range of the
inverter is specified in the operating parameters (see Technical Description
"Operating Parameters" at www.SMA-Solar.com).
Procedure:
1. Select suitable cable gland for the AC cable
2. Disconnect the miniature circuit-breaker and secure against reconnection.
3. Strip the AC cable by 30 mm.
4. Shorten L and N by 5 mm each.
5. Strip the insulation of L, N, and PE by 4 mm each.
Item
Description
A
Bush insert
B
Threaded sleeve
C
Sealing ring PG13.5
D
Clamping cage PG13.5
E
Pressure screw PG13.5 for cable diameter between 7 mm and 10 mm
F
Cable gland M20x1.5 for cable diameter between 10 mm and 14 mm
Содержание SUNNY BOY 1300TL
Страница 1: ...SB13_21TL IA en 65 Version 6 5 EN PV Inverter SUNNY BOY 1300TL 1600TL 2100TL Installation Manual...
Страница 2: ......
Страница 69: ......
Страница 70: ......