SMA Solar Technology AG
Electrical Connection
Installation Guide
SB11_17-IEN084820
25
3. If the connection plan of the communication device indicates it as necessary:
– Ground the shield of the communication cable at the tab (C).
4. Install the communication cable (B) as illustrated in the following figure.
5. Connect the communication cables to the screw terminal strip (D) as described in the connection
plan of the communication device.
6. Connect the jumpers (E) if the connection plan of the communication device indicates this as
necessary. A detailed description of the jumper functiosn can be found in the communication
device documentation.
7. Plug the communication interface left-justified on the interface slot (F).
8. Close the Sunny Boy as described in section 7.2 „Closing the Sunny Boy“ (32).
A
Enclosure openings in the base of the Sunny Boy.
B
Cable route (gray surface)
C
Tab for grounding the cable shield
D
Screw terminals for the connection of the communication wires.
E
Jumper slot
F
Interface slot
PE
L
N
A
B
C
A
S2
A
B
B
S1
A
S2
A
B
B
S1
A
B
C
D
E
B
C
A
F
Содержание SUNNY BOY 1100
Страница 1: ...PV Inverter SUNNY BOY 1100 1700 Installation Guide SB11_17 IEN084820 IMEN SB11_17 Version 2 0 EN...
Страница 2: ......
Страница 45: ...SMA Solar Technology AG Contact Installation Guide SB11_17 IEN084820 45...
Страница 46: ...Contact SMA Solar Technology AG 46 SB11_17 IEN084820 Installation Guide...