7 Commissioning the Inverter
SMA Solar Technology AG
Replacement Manual
STP50-40-COM-RM-xx-11
19
7
Commissioning the Inverter
Requirements:
☐ The AC circuit breaker must be correctly rated and mounted.
☐ The inverter must be correctly mounted.
☐ All cables must be correctly connected.
☐ Unused enclosure openings must be sealed tightly with sealing plugs.
Procedure:
1. Carry out the necessary tests according to the locally applicable laws, standards and
directives for the correct recommissioning after power assembly replacement. Take the
requirements for component replacements into account (see Section 2.2 "IMPORTANT
SAFETY INSTRUCTIONS", page 8).
2. Ensure that the grounding conductor in the inverter is correctly connected and functions
properly.
3. Ensure that the DC load-break switch is turned to position
0
.
4. For STP 50-US-40 / STP 33-US-41 / STP 50-US-41 / STP 62-US-41: Ensure that the AC load-
break switch is turned to position
0
.
5. To avoid invalid serial numbers from being sent to the data logger, commission the inverter
without being connected to the local network first. To do this, ensure that the RJ45 connection
to the network is not established.
6. Position the enclosure lid of the AC-Connection Unit
on the AC-Connection Unit and first tighten the
upper-left and lower-right screws, and then the
remaining screws crosswise (TX 25, torque: 6 Nm
(53 in-lb)).
2
1
10x
10x
7. Position the enclosure lid of the DC-Connection Unit on the DC-Connection Unit and first
tighten the upper-left and lower-right screws, and then the remaining screws crosswise (TX 25,
torque: 6 Nm (53 in-lb)).
8. Connect the DC connector to the inverter in its original position.
☑ The DC connectors snap into place.
9. Ensure that all DC connectors are securely in place.
10. For STP 50-US-40 / STP 33-US-41 / STP 50-US-41 / STP 62-US-41: Turn the AC load-break
switch of the inverter to position
I
.
11. Switch on the AC circuit breaker.
☑ All 3 LEDs light up. The start-up phase begins.
☑ All 3 LEDs go out again after approximately 90 seconds.
ENGLISH
Содержание NR-PC-KP20L.BG1
Страница 66: ...1 SMA Solar Technology AG STP50 40 COM RM xx 11 66 1 5...
Страница 69: ...2 SMA Solar Technology AG STP50 40 COM RM xx 11 69 5 DC DC DC DC...
Страница 70: ...2 SMA Solar Technology AG STP50 40 COM RM xx 11 70 5 DC DC AC...
Страница 71: ...2 SMA Solar Technology AG STP50 40 COM RM xx 11 71 DC 1000 V DC 5 C...
Страница 72: ...2 SMA Solar Technology AG STP50 40 COM RM xx 11 72 v v SMA SMA SMA Solar Technology AG...
Страница 78: ...5 SMA Solar Technology AG STP50 40 COM RM xx 11 78 DC DC DC 1 1 DC DC DC PE PE 4...
Страница 83: ...8 SMA Solar Technology AG STP50 40 COM RM xx 11 83 8 1 SMA Solar Technology AG 2...
Страница 233: ...1 SMA Solar Technology AG STP50 40 COM RM xx 11 233 1 5 1 6 X703 1 X703 6 10 WCtlHz Hz...
Страница 234: ...1 SMA Solar Technology AG STP50 40 COM RM xx 11 234 1 7 Sunny Tripower CORE1 COM COM COM...
Страница 236: ...2 SMA Solar Technology AG STP50 40 COM RM xx 11 236 5 DC DC DC DC DC...
Страница 237: ...2 SMA Solar Technology AG STP50 40 COM RM xx 11 237 5 DC DC AC...
Страница 238: ...2 SMA Solar Technology AG STP50 40 COM RM xx 11 238 DC 1000 V DC 5 C...
Страница 239: ...2 SMA Solar Technology AG STP50 40 COM RM xx 11 239 SMA SMA SMA Solar Technology AG...
Страница 244: ...5 SMA Solar Technology AG STP50 40 COM RM xx 11 244 DC DC DC 1 1 DC DC DC 1 4...
Страница 249: ...8 SMA Solar Technology AG STP50 40 COM RM xx 11 249 8 1 SMA Solar Technology AG 2...
Страница 252: ...www SMA Solar com...