Illustration 3.4 LCS Tool - Initial Screen
3.
Verify that date and time are correct. If not, set
date and time and continue. See
.
Illustration 3.5 LCS Tool - Verify Date and Time
4.
A list of inverters identified by the selected
Inverter Manager is shown. See
Verify that the list of inverters is complete.
Verify that all inverters are present. It is possible
to continue the configuration of the listed
inverters even if not all inverters are discovered.
The undiscovered inverters can always be
configured later.
Initial Setup and Start
L00410644-01_2q / Rev. date: 2014-06-02
23
3
3