background image

Table of Contents

1

Information on this Document.....................................................................................................

3

1.1

Validity .............................................................................................................................................................

3

1.2

Target Group ...................................................................................................................................................

3

1.3

Additional Information.....................................................................................................................................

3

2

Product Overview ........................................................................................................................

4

2.1

Design of the MV Power Station ....................................................................................................................

4

2.2

Option code.....................................................................................................................................................

5

2.3

Scope of Delivery ............................................................................................................................................

9

2.4

External dimensions and weights ................................................................................................................... 11

3

Transport and Mounting.............................................................................................................. 13

3.1

Transport by truck, train or ship ...................................................................................................................... 13

3.2

Storage............................................................................................................................................................. 14

3.3

Requirements and Ambient Conditions .......................................................................................................... 14

3.4

Unloading ........................................................................................................................................................ 14

4

Information for Installation ......................................................................................................... 19

4.1

Minimum Clearances ...................................................................................................................................... 19

4.2

Supply Air and Exhaust Air............................................................................................................................. 19

4.3

Installation ........................................................................................................................................................ 21

4.3.1

Design of the System with MV Power Station ................................................................................................ 21

4.3.2

Support surface ................................................................................................................................................ 22

4.3.3

Pea gravel ground ........................................................................................................................................... 22

4.3.4

Weight load ..................................................................................................................................................... 22

4.3.5

Mounting options ............................................................................................................................................. 22

4.3.5.1

Flagstones........................................................................................................................................................ 23

4.3.5.2

Pile-driven steel pillars..................................................................................................................................... 23

4.3.5.3

Concrete pillar................................................................................................................................................. 24

4.3.5.4

Strip foundations ............................................................................................................................................. 24

4.3.5.5

Foundation plate ............................................................................................................................................. 25

4.3.6

Erecting the service platforms.......................................................................................................................... 26

4.3.7

Recesses in the Support Surface ..................................................................................................................... 28

4.4

Oil spill containment........................................................................................................................................ 31

4.4.1

Oil Spill Containment for the MV Power Station with One Inverter ............................................................. 31

4.4.2

Oil Spill Containment for the MV Power Station with Two Inverters ............................................................ 32

5

Electrical Connection .................................................................................................................... 34

5.1

Grounding Concept ........................................................................................................................................ 34

5.2

Cable Requirements ........................................................................................................................................ 34

5.3

Q at Night........................................................................................................................................................ 35

6

On-Site Services............................................................................................................................ 37

Table of Contents

SMA Solar Technology AG

Transportation and Installation Requirements

MVPS22JP-TA-en-20

2

Содержание MEDIUM VOLTAGE POWER STATION 1000-1SC-JP

Страница 1: ...SMA Transportation and Installation Requirements MEDIUM VOLTAGE POWER STATION 500SC JP 630SC JP 800SC JP 1000 1SC JP 1000 2SC JP 1250SC JP 1600SC JP 2000SC JP MVPS22JP TA en 20 Version 2 0 ENGLISH...

Страница 2: ...Power Station 21 4 3 2 Support surface 22 4 3 3 Pea gravel ground 22 4 3 4 Weight load 22 4 3 5 Mounting options 22 4 3 5 1 Flagstones 23 4 3 5 2 Pile driven steel pillars 23 4 3 5 3 Concrete pillar...

Страница 3: ...is indicated on the type label Illustrations in this document are reduced to the essential and may deviate from the real product 1 2 Target Group The tasks described in this document must only be per...

Страница 4: ...age switchgear The medium voltage switchgear disconnects the MV trans former from the medium voltage grid E Communit or Control device for cascade control The Communit contains control and communicati...

Страница 5: ...P 1 x SC 500CP JP MV Power Station 630SC JP 1 x SC 630CP JP MV Power Station 800SC JP 1 x SC 800CP JP MV Power Station 1000 1SC JP 1 x SC 1000CP JP MV Power Station 1000 2SC JP 2 x SC 500CP JP MV Powe...

Страница 6: ...11 3 YNd11d11 MV transformer 2 Mineral oil with hermetical protection 3 Organic oil with hermetical protection Oil spill contain ment 0 Without 1 With supplied as a separate accessory Medium voltage s...

Страница 7: ...ers and two voltage converters per in verter 2 For transformer for internal power supply measurement via four combined instrument transformers 3 For inverter and transformer for internal power supply...

Страница 8: ...environment and dust supple mentary dust protection of the medium voltage switchgear and the transformer for internal power supply Additional equipment 0 Without 1 Seismic and storm qualification str...

Страница 9: ...bracket F 1 Oil spill containment with oil drain valve G 1 Spare paint RAL 7004 for the container H 1 Documentation circuit diagram Optional Depending on the production version the oil drain valve is...

Страница 10: ...f the inverter The indicated number of the individual components differs depending on the number of mounted inverters in the MV Power Station Figure 4 Scope of delivery of the inverter Position Quanti...

Страница 11: ...ns and weights 1550 mm 2438 mm 2250 mm 2726 mm 1480 mm 723 mm 6058 mm 755 mm Figure 5 Dimensions of the MV Power Station Dimensions of the MV Power Station without Platforms and Support Feet Width Hei...

Страница 12: ...6938 mm 2941 mm 5598 mm 10 t MV Power Station 1000 2SC JP 1250SC JP 1600SC JP 2000SC JP 6938 mm 2941 mm 5598 mm 14 t The weight of the MV Power Station may vary below the indicated weight depending on...

Страница 13: ...become damaged Paint damage does not impair the function of the MV Power Station but must be repaired by the customer using the spare paint supplied within three weeks For transportation by truck tra...

Страница 14: ...and curve radius of the truck Transport must be carried out by truck with air sprung chassis The unloading site for the crane and truck must be firm dry and horizontal 3 4 Unloading The MV Power Stati...

Страница 15: ...with a width across flats of 30 mm and 36 mm are required Attaching the support feet of the MV Power Station To attach the support feet to the MV Power Station you can set the MV Power Station down f...

Страница 16: ...ipment of the Earthquake and storm qualification order option With this option the container is reinforced and delivered with special support feet When mounting and installing the MV Power Station obs...

Страница 17: ...e height 20 mm C Outside support foot with a height of 368 mm non adjustable height D Central support foot with a height of 368 mm non adjustable height For the order option Earthquake and storm quali...

Страница 18: ...ir base plates flush with the MV Power Station The stud bolt of the central support foot must point outwards Any unevenness of the support surface up to 20 mm can be compensated with the standard supp...

Страница 19: ...rter side Recommended minimum clearances for service assignments 6000 mm 6000 mm 3000 mm 1000 mm Minimum clearances for trouble free operation 2000 mm 2000 mm 2000 mm 1000 mm The service platforms are...

Страница 20: ...in accordance with EN 60721 3 4 class 4C2 The MV Power Station can be installed in chemically active environments e g in coastal areas In this case you must select the appropriate order option This or...

Страница 21: ...spray b Sulfur dioxide mg m3 0 1 0 3 1 0 c Hydrogen sulfide mg m3 0 01 0 1 0 5 d Chlorine mg m3 0 1 0 1 0 3 e Hydrogen chloride mg m3 0 1 0 1 0 5 f Hydrogen fluoride mg m3 0 003 0 01 0 03 g Ammonia mg...

Страница 22: ...ervice vehicles e g forklifts 4 3 4 Weight load The weight load on each of the six support feet of the MV Power Station is 4000 kg The installation surfaces e g strip foundations are to be designed ac...

Страница 23: ...ground e g gravel 4 3 5 2 Pile driven steel pillars Minimum length of the steel pillars The driven depth of the steel pillars must satisfy the structural requirements Figure 15 Pile driven steel pill...

Страница 24: ...mple A B A C A A A B SMA Figure 17 Concrete pillars example Position Designation A Concrete pillar B Solid ground e g gravel C Pea gravel ground 4 3 5 4 Strip foundations The strip foundations must ha...

Страница 25: ...ace for the support feet of the work platforms must be constructed separately Depth 6440 mm for foundation including mounting surface for work platforms 2850 mm for foundation of the station container...

Страница 26: ...y to open up and step onto the service platforms Consequently it must be possible to erect the service platforms safely and firmly enough to guarantee personal safety when stepping onto the platform T...

Страница 27: ...included in the specification of the minimum clearances Local regulations for hand rails must be observed Hand rails for the service platforms are not included in the scope of delivery of the product...

Страница 28: ...e Recesses for cable routing must be provided in the support surface For the MV Power Station with two inverters an additional recess is required for the oil spill containment During planning of the r...

Страница 29: ...eath the medium voltage switchgear for insertion of the AC cables Maximum six cables per cable panel maximum cable diameter 55 mm C Recess underneath the Communit for insertion of the data cables and...

Страница 30: ...or insertion of the AC cables Maximum six cables per cable panel maximum cable diameter 55 mm C Recess underneath the Communit for insertion of the data cables and grounding cables 3 x PG9 for cable d...

Страница 31: ...gure 24 Position of the oil spill containment example 4 4 1 Oil Spill Containment for the MV Power Station with One Inverter The oil spill containment must be positioned underneath the transformer com...

Страница 32: ...surface around the oil spill containment should be pea gravel ground The oil spill containment should be fitted with theft protection The inspection shaft is to be installed on site Space for maintena...

Страница 33: ...ameter 8 mm Oil Spill Containment Dimensions and Weight Width Height Depth Weight 1620 mm 610 mm 2400 mm 160 kg The height of the oil spill containment can be adjusted 4 Information for Installation S...

Страница 34: ...current levels Grounding of the oil spill containment must be carried out during installation The two grounding bolts located on the left side of the oil spill containment can be used for this A B C...

Страница 35: ...fiber pigtail 50 m multi mode optical fiber Two optical fiber pigtails with subscriber connector or Connection of optical fibers with subscriber connector Two subscriber connectors Grounding conductor...

Страница 36: ...ht can feed in up to 30 of the maximum possible inverter power as reactive power to the utility grid Figure 28 Maximum possible load profile of the MV Power Station 5 Electrical Connection SMA Solar T...

Страница 37: ...spection shaft for the oil drain valve Installation of the optional oil spill containment including oil spill containment grounding Protective tubes for cable entry External grounding system All mount...

Страница 38: ...www SMA Solar com...

Отзывы: