6 Maintenance
SMA Solar Technology AG
Maintenance Manual
43
SCCP-JP-B1-WA-en-23
Task
See
Checking the AC disconnection unit
Manufacturer documentation
(see Section 1.7, page 7)*
Check the fans
Checking the heating element and the hygrostat
Checking the function of the UPS
* In deviation to the maintenance interval specified by ABB, the maintenance interval of 24 months stated in this documentation applies.
Maintenance under voltage-free conditions
Task
See
Performing the visual inspection
Analyzing the temperature indicators
Cleaning the ventilation plate
Clean the air duct, ventilation grids and air intake.
Checking the interior
Checking the seals
Checking the latches, door stops and hinges
Checking the inverter surface
Checking the fuses/disconnection blades
Checking the bolted connections
Checking the surge arresters
Checking the labels
6.3
Repair Schedule and Spare Parts
6.3.1
Information on Repair Work
Spare parts
Only original parts or parts recommended by SMA Solar Technology AG are to be used as spare parts when
replacing components.
Spare parts can be identified via the reference designation and the circuit diagram. The spare-parts list includes
the article numbers of each spare part. For information on a specific article number, contact us (see Section 9
"Contact", page 66).
6.3.2
Demand-Based Annual Repairs
Task
Interval
Replace key switch
In case of severe signs of wear
Replace surge arrester
If tripped
Replace labels on the enclosure
If illegible, defective or missing